Great Yarmouth Borough Council Portal
PLANNING APPLICATION DETAILS
Reference06/24/0066/PAD
StatusNot proceeded with     
ProposalInstallation of Solar Panels to the property roof The solar panels will be connected to a 25 kW three phase inverter. The panel array will be connected to separate MPP Trackers** in order to effectively optimise the orientation of the building and minimise the effects of any shading elements. The batteries and other controls will be located in the electrical switch room and all cable, containment and mounting materials will be provided. The four 5.8 kWh batteries will be configured in an â¿¿AC Coupledâ¿¿ setup and would be charged from a designated charge controller. We estimate that the installation will be completed in approximately 3-4 days by our installation team. We may be required to store some components on site during the work, providing this can be done securely and without undue inconvenience. We will erect scaffolding at eaves height and edge protection where required to provide safe access to the roof in order to complete the installation. We will notify the District Network Operator (DNO) of the installation to ensure it is correctly registered on the network.
LocationMarine Park, Marine House Gapton Hall Road Bradwell NR31 0NB
ParishBradwell North
Case OfficerAdmin Person
Received25-01-24
Validated25-01-24
Decision By21-03-24
NeighboursConsultation Started : ,     Comments Due :
Decided05-03-25
ApplicantMr Andrew Jarvis Kestrel Court, Waterwells Drive Gloucester Gloucestershire GL2 2AT
AgentMr Andrew Jarvis Kestrel Court, Waterwells Drive Gloucester Gloucestershire GL2 2AT