| No. | Condition Text |
|---|
| 1. | This permission expires on 30th.June 2002 and unless on or before
this date application has been made for an extension to the period of
permission and such application is approved by the Local Planning Authority
the use shall be discontinued.
The reason for the condition is:-
In order to retain control over the use of the site until the effects of
the proposal have been experienced and in the interest of the amenities of
the locality. |
| 2. | The site shall only be used for the dismantling of offshore platforms and
equipment attached thereto and only for the breaking up of such structures
and equipment as are brought in by sea and the site shall not be used as a
general scrapyard for the breaking up of any other equipment whatsoever.
The reason for the condition is :-
This permission is granted under exceptional circumstances because of the
proposed port-related nature of the proposed operation and to prevent
undue congestion of the highway by the delivery of wide/heavy loads by
road transport. |
| 3. | Before the use hereby approved is first commenced operational and
non-operational parking spaces shall be provided within the site in
accordance with details to be submitted to and approved by the Local
Planning Authority.
The reason for the condition is :-
In order to ensure satisfactory off-street parking to meet the needs
generated by the development. |
| 4. | Details of any alterations to the existing access arrangements necessitated
by the proposed use shall be submitted to and approved by the Local
Planning Authority before any work is commenced.
The reason for the condition is :-
For the avoidance of doubt and in the interests of highway safety. |
| 5. | Prior to the bringing into port for dismantling each structure shall be
fully surveyed to identify likely hazards and a full environmental and
working method statement addressing such issues as potential ground and
ground water contamination from oils and chemicals,potential air
pollution from dust, fumes from cutting torches, possible asbestos and
asbestos substitutes, low specific activity (LSA) scale and noise, shall be
submitted to and approved by the Borough Environmental Health Officer
before any dismantling work is commenced.
The reason for the condition is :-
To prevent pollution of the environment and in the interests of the
amenities of the occupiers of adjacent sites. |
| 6. | Any facilities for the storage of oils, fuels or chemicals shall be sited
on impervious bases and surrounded by impervious bund walls.The volume of
the bunded compound should be at least equivalent to the capacity of the
tank plus 10%.If there is multiple tankage, the compound should be at least
equivalent to the capacity of the largest tank, or the combined capacity of
interconnected tanks, plus 10%.All filling points, vents, gauges and sight
glasses must be located within the bund.The drainage system of the bund
shall be sealed with no discharge to any watercourse,land or underground
strata.Associated pipework should be located above ground and protected
from accidental damage.All filling points and tank overflow pipe outlets
should be detailed to discharge downwards into the bund.
The reason for the condition is :-
To prevent pollution of the water environment. |
| 7. | There shall be no discharge of foul or contaminated drainage from the site
into either groundwater or any surface waters, whether direct or via
soakaways.
The reason for the condition is :-
To prevent pollution of the water environment.
Informative Notes.
a) The applicant is reminded of the need to comply fully with the
requirements contained in Environment Agency's letter attached to the
planning permission issued under Ref.No.06/96/0206/CU.
b) The applicant is advised that there is a tunnel running from the
application site to the former power station and care should be taken
to ensure that no operations are carried out which might result in the
collapse of the underground tunnel. |