| No. | Condition Text |
|---|
| 1. | The development must be begun not later than five years beginning with the date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. |
| 2. | The development shall be carried out in accordance with the following revised plans layout plan 2948/14 rev C received on 18th November 1999, 2948/15 rev B received on 18th November 1999 and 2948/16/17 & 18 rev A received by the Local Planning Authority on 29th October 1999.
The reason for the condition is:-
For the avoidance of doubt. |
| 3. | Prior to the occupation of any unit of accommodation on the development hereby permitted the footpath link between the river wall and Crittens Road at the northern end of the site shall be constructed in accordance with details to be submitted to and approved by the Local Planning Authority and shall remain available for use by the general public thereafter.
The reason for the condition is:-
To ensure access to the riverside walk is maintained. |
| 4. | Before the development is commenced a scheme of planting and landscaping shall be submitted for the approval of the Local Planning Authority and the planting of trees and shrubs shall be carried out in accordance with the scheme as approved within of the approval. Any trees and shrubs so planted which dies within 3 years shall be replaced within one year by the applicants or their sucessors in title.
The reason for the condition is:-
To enhance the visual amenities of the locality |
| 5. | The occupation of the wardens accommodation shall be limited to a person employed to oversee the operation of the sheltered accommodation, or a dependant of such a person residing with him or her.
The reason for the condition is:-
In order to retain control over the use of premises hereby permitted. |
| 6. | No work shall commence until the exact type and colour of the materials have been submitted to and approved by the Local Planning Authority.
The reason for the condition is :-
In the interests of the visual amenities of the area as precise details of the materials have not been submitted. |
| 7. | No development shall take place on the site until the diversion of Public Footpath No.4 at the southern end of the site has been carried out in accordance with the necessary footpath diversion order and the surfacing of the diverted footway has been carried out in accordance with details to be submitted and approved by the Local Planning Authority.
The reason for the condition is:-
To ensure the provison of a suitable route for the diverted footpath. |
| 8. | Before any work is commenced on the site full engineering drawings for the improvement of Crittens Road shall have been submitted to and approved by the Local Planning Authority in consultation with the Highway Authority.
The reason for the condition is:-
To ensure the provision of a satisfactory highway approach to the development hereby permitted. |
| 9. | The improvement of Crittens Road shall be carried out with the benefit of a Section 106 Agreement and shall have been completed before any work starts within the development site.
The reason for the condition is:-
To ensure that the works are carried out to a suitable standard. |
| 10. | Before the first dwelling is occupied the estate road and footways shall have been constructed to a standard to be agreed in writing with the Local Planning Authority.
The reason for the condition is:-
To provide the residents of the development with satisfactory highway approaches to their property. |
| 11. | NOTES - Please read the following notes carefully:-
The Environment Agency comment in repect of the above mentioned development:-
Under the terms of the Water Resources Act 1991 and the Land Drainage Byelaws, the prior written consent of the Agency is required for any proposed work or structureseither affecting or within 9 metres of the tidal or fluvial flood defences.
The site is below highest recorded tide levels and could be at risk from breach or overtopping of the defences.
The applicant is advised that due to the proximity of the development to the river special consideration may have to be given to the form of any foundations due to the form and constuction of the adjacent river wall. Furthermore to enable any repairs to be carried out to the river wall may result in some disturbance to the amenity areas adjacent to the development.
THE APPLICANTS ATTENTION IS DRAWN TO THE FACT THE DEVELOPMENT HEREBY APPROVED IS SUBJECT TO THE TERMS OF AN AGREEMENT DATED 00TH OCTEMBER 0000 PREPARED UNDER THE PROVISIONS OF SECTION 106 OF THE TOWN AND COUNTRY PLANNING ACT 1990. |