Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than five years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2.No surface water shall be discharged to the foul sewer. The reason for the condition is:- To avoid overloading the sewerage system and avoid problems of pollution.
3.The existing portable units shall be removed from the site within one month of the building hereby permitted being brought into use, unless application is made to the Local Planning Authority for the retention of the temporary units. The reason for the condition is:- In the interests of the visual amenities of the locality.
4.Before the development is commenced a scheme of planting and landscaping shall be submitted for the approval of the Local Planning Authority and the planting of trees and shrubs shall be carried out in accordance with the scheme as approved within one year of the approval. Any trees and shrubs so planted which dies within 3 years shall be replaced within one year by the applicants or their sucessors in title. The reason for the condition is:- To enhance the visual amenities of the locality
5.NOTES - Please read the following notes carefully:- The applicant's attention is drawn to the attached comments of the Norfolk development. Constabulary Architectural Liaison Officer in respect of the proposed
6.The Council's Access Officer has requested that the following items be incorporated in the proposed development in the interests of people with disabilities :- (i) level or ramped approaches to all doorways (1:20 maximum slope preferred), (ii) level standing at doorways, (iii) flush thresholds, and (iv) wide (900mm preferred, 838mm minimum) easy to open doors.