No.Condition Text
1.The development must be begun not later than five years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2.The development shall not be carried out other than in complete accordance with the following drawings :- a) Drawing No.G2868/14 Rev.B. - Layout plan. b) Drawing No.G2868/15. - Bungalow design details. c) Drawing No.G2868/10. - Bungalow design details. d) Drawing No.G2868/13 - Elevations of semi-detached garages. The reason for the condition is :- For the avoidance of doubt.
3. No development shall be commenced until detailed drawings of the proposed detached garages to be erected have been submitted to and approved by the Local Planning Authority and the garages shall not be erected other than in accordance with the details as may be approved. The reason for the condition is ;- In the interests of the residential amenities of the occupiers of adjacent property as details of the structures have not been submitted. In the interests of the residential amenities of the occupiers of 56 Crosstead.
4.Prior to the commencement of development a scheme for the construction of a footway to an adoptable standard along the frontage to Fremantle Road, including longitudinal and cross sections and details of street lighting, shall be submitted to and approved by the Local Planning Authority and all works shall be carried out in accordance with the scheme as may be approved before any of the dwellings are first occupied. The reason for the condition is :- To ensure the construction of satisfactory pedesrian approaches to the development.
5.Details of the surface water sewer to be constructed in Fremantle Road, to an adoptable standard, shall be submitted to and approved by the Local Planning Authority before any development is commenced and the sewer shall be constructed in accordance with the detaoils as may be approved before any of the dwellings hereby approved are first occupied. The reason for the condition is :- In order to effect satisfactory drainage arrangements both on and from the site.
6.A scheme for the erection of a means of enclosure to the front gardens of all the dwellings hereby approved shall be submitted to and approved by the Local Planning Authority and the enclosures shall be erected in accordance with the approved scheme before the dwellings to which they relate are first occupied. The reason for the condition is :- For the avoidance of doubt and in the interests of visual amenity.
7.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 or any order revoking or re-enacting the order, no extensions shall be built or windows inserted into the walls or roof of the dwellings without the prior permission of the Local Planning Authority. The reason for the condition is :- In the interests of the residential amenities of the occupiers of adjacent property and to ensure that access is kept available to maintain any underground services.
8.Prior to the commencement of any development on the plot of the northernmost dwelling hereby approved, a scheme to safeguard the privacy of the occupiers of 56 Crosstead, in respect of the window in the eastern gable of 56 Crosstead,shall be submitted to and approved by the Local Planning Authority and the scheme shall be implemented in accordance with the datails as may be approved before the proposed dwelling is first occupied. The reason for the condition is :- In the interests of the residential amenities of the occupiers of the adjacent property.
9.Before any development is commenced floor plans of the proposed dwellings shall be submitted to and approved by the Local Planning Authority and the development shall not be carried out other than in accordance with the approved plans. The reason for the condition is :- For the avoidance of doubt as the floor plans submitted do not relate to revised elevational drawings approved.
10.Prior to the commencement of any development,details of all surface equipment and engineering works associated with the construction of the underground foul water pumping station together with a landscaping scheme, shall be submitted to and approved by the Local Planning Authority.The pumping station so constructed shall, unless otherwise agreed in writing by the Local Planning Authority, be offered for adoption by Anglian Water within 12 months of the completion of the residential development hereby approved by which time all the landscaping works shall have been completed. The reason for the condition is:- In the interests of visual amenity as no details of the pumping station have been submitted and to ensure satisfactory drainage arrangements both on and from the site.
11.NOTES - Please read the following notes carefully:- a) Anglian Water has indicated that no development should take place within 4.5 metres of the existing 450mm. Ductile Iron Pumping Main. b) The Environment Agency has indicated that, prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from impermeable parking areas and hard standings shall be passed through trapped gullies with an overall capacity compatible with the site being drained.