Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than five years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2.The development hereby permitted shall be carried out in accordance with Drawing Nos. 98/249/04 Rev F, 98/249/06 Rev B, 98/255/02 Rev A, 98/255/03 Rev A, 98/265/01 Rev B, 98/267/01 Rev C, 98/268/02 Rev B, 98/270/01 Rev B, 98/273/01 Rev A, 98/273/03 Rev A and 98/273/04. The reason for the condition is :- To ensure the permission relates to the correct documents.
3.The slab level of the dwellings shall be as indicated on Drawing No. 98/249/06 Rev B. The reason for the condition is :- In the interests of the residential amenities of the occupiers of adjacent property and in the interests of the appearance of the development. continued on next page :-
4.The facing bricks to be used in the construction of the dwellings shall be in accordance with the schedule submitted with the applicant's letter dated 7th August 1998 as amended by paragraph 1 of the applicant's letter dated 11th November 1998, and the roof covering of the dwellings shall be in accordance with the schedule submitted with the applicant's letter dated 18th November 1998. The external materials to be used in the construction of the garages, G2, G3, G6 and G26-27, shall be in accordance with the table submitted as part of the applicant's fax of 15th January 1999. The reason for the condition is :- For the avoidance of doubt and in the interests of the visual amenities of the locality.
5.No works shall commence on the site until such time as detailed plans of the roads, footways, foul and "on-site" surface water drainage have been submitted to and approved by the Local Planning Authority. The reason for the condition is :- To ensure the construction of the estate road is of a standard suitable for adoption as a County road.
6.No works shall be carried out on roads, footways, foul and surface water sewers otherwise than in accordance with the specifications of the Local Planning Authority. The reason for the condition is :- To ensure the construction of the estate road is of a standard suitable for adoption as a County road.
7.No dwelling shall be occupied until such time as a road and footway have been constructed from the dwelling to the adjoining County road to a standard to be agreed, in writing, with the Local Planning Authority. The reason for the condition is :- To provide the residents of the estate with satisfactory highway approaches to their property.
8.No dwellings shall be occupied until such time as the existing footway adjacent to Martham Road has been widened and associated drainage works have been carried out in accordance with Drawing No. 98GY10841/02/P6. The reason for the condition is :- In the interests of pedestrian safety and to safeguard the interests of highway surface water disposal and land drainage.
9.No surface water shall be discharged to the foul sewer. The reason for the condition is :- To avoid overloading the sewerage system and avoid problems of pollution. continued on next page :-
10.All planting, seeding or turfing indicated on Drawing No. 98/249/06 Rev B (with the exception of Genista, which shall be replaced by other noted species) shall be carried out in the first planting and seeding seasons following the occupation of the dwellings or the completion of the development, whichever is the sooner; and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation. The reason for the condition is :- In the interests of the visual amenities of the locality.
11.No dwellings shall be occupied until the driveway and/or car parking space to which a dwelling relates has been surfaced in accordance with the details indicated on Drawing No. 98/249/06 Rev B. The reason for the condition is :- To provide the residents of the estate with satisfactory parking facilities and highway approaches to their property, and in the interests of the visual amenities of the locality.
12.No dwellings shall be occupied until the section of screen wall/fence to which a dwelling relates has been erected in accordance with the details indicated on Drawing No. 98/249/06 Rev B. Details of the exact type and colour of the bricks to be used shall be submitted for the prior approval of the Local Planning Authority. The reason for the condition is ;- In the interests of residential and visual amenity.
13.The garages shall only be used for private domestic use in connection with the dwelling to which they relate. The reason for the condition is :- In the interests of the residential amenities of the occupiers of adjacent property.
14.NOTES - Please read the following notes carefully:-
15.1. The Kings Lynn Consortium of Internal Drainage Boards has commented that if the surface water from the development is directed to the Muckfleet and Southflegg IDB main drain to the south of the site, a development contribution will be levied. The Board's Engineer should be contacted at the earliest possible date. continued on next page :-
16.2. The Council's Access Officer has requested that, in respect of the bungalows, the following items be incorporated in the proposed development in the interests of people with disabilities :- (i) ramped approaches, (ii) level standing at doorways, (iii) flush thresholds, and (iv) wide (838mm) easy to open doors.