| No. | Condition Text |
|---|
| 1. | The development must be begun not later than five years beginning with the
date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 91 of the Town and Country
Planning Act 1990. |
| 2. | The development shall be carried out in accordance with the revised plan
received by the Local Planning Authority on 14 May 1993.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | Prior to the occupation of any of the dwellings hereby permitted the
garaging and vehicle parking and manoeuvring areas shall have been
constructed in accordance with detailed plans approved in advance by the
Local Planning Authority in writing.
The reason for the condition is:-
These details do not from part of the submission. |
| 4. | Prior to the commencement of the development a scheme for hard and soft
landscaping, including details of all walls and fencing, shall be submitted
to, and approved in writing by, the Local Planning Authority and shall be
fully implemented before the end of the planting season immediately
following the occupation of any of the dwellings. Any trees or shrubs which
within a period of five years from initial planting fail for any reason
shall be replaced by specimens of the same size and species by the
applicant or their successors in title.
The reason for the condition is:-
To ensure the satisfactory appearance of the development. |
| 5. | Notwithstanding the provisions of the Town and Country Planning (General
Permitted Development) Order 1995 (or any order revoking and re-enacting
the order) no extensions shall be built or windows inserted into the walls
or roof of the dwellings without the prior consent of the Local Planning
Authority.
The reason for the condition is:-
To retain control over the appearance and character of the development. |
| 6. | All window casements shall be flush with frames and lights recessed within
the frames and all eaves shall be sprocketed or have brick cornices.
Notwithstanding the details specified the roof tiles shall be hand made
clay of a type submitted to, and approved in writing by, the Local Planning
Authority and all rainwater goods shall be in cast iron or painted
aluminium rather than PVC and the precise colour of stains used in the
joinery must be agreed in writing in advance with the Local Planning
Authority.
The reason for the condition is:-
To retain control over details of the development in the interests of its
final appearance. |
| 7. | Prior to the commencement of the development details of foul and surface
water drainage shall be submitted to, and approved in writing by, the
Local Planning Authority and the development shall thereafter be drained
in accordance with these details.
The reason for the condition is:-
To ensure adequate means of drainage for the development. |