| No. | Condition Text |
|---|
| 1. | The development must be begun not later than five years beginning with the
date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 91 of the Town and Country
Planning Act 1990. |
| 2. | Notwithstanding the provisions of the Town and Country Planning (General
Permitted Development) Order 1995 (or any order revoking and re-enacting
the order) no extensions shall be built onto, or windows inserted into, the
walls or roof of, the dwellings resulting from this conversion.
The reason for the condition is:-
In the interests of the residential amenities of the occupiers of the
adjacent properties and to protect the character of the buildings. |
| 3. | All landscaping shown in the approved plans shall be carried out in the
first planting and seeding season following the occupation of the buildings
or the completion of the development, whichever is the sooner, and any
trees or plants which within a period of 5 years from the completion of the
development die, are removed or become seriously damaged or diseased shall
be replaced in the next planting season with others of similar size and
species, unless the Local Planning Authority gives written consent to any
variation.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 4. | The existing trees on the site shall not be felled or damaged in any way
without the prior consent in writing of the Local Planning Authority.
The reason for the condition is:-
The existing trees represent an important visual amenity which the Local
Planning Authority consider should be substantially maintained. |
| 5. | The development shall be carried out in accordance with the revised plan
received by the Local Planning Authority on 04-06-1998.
The reason for the condition is :-
For the avoidance of doubt. |
| 6. | The development shall only proceed in accordance with detailed working
specifications showing the areas of external brickwork and flint work
that require rebuilding, stitching or repair. These specifications shall be
submitted to, and approved in writing by, the Local Planning Authority
prior to work commencing and shall include details of bonding and mortar
mix and, at the discretion of the Local Planning Authority, will involve
the prior approval of a sample panel of brick or flintwork. All work shall
be carried out in accordance with established conservation principles set
out in a methodology which shall form part of these specifications.
The reason for the condition is:-
The buildings are of old fabric and the work should be carried out
sympathetically in view of this by suitably experienced craftsmen. |
| 7. | The position of all external pipework and other fixtures, such as flues,
vents, alarms boxes, television aerials and satellite dishes, not detailed
on the approved drawings shall be first agreed in writing by the Local
Planning Authority.
The reason for the condition is:-
To retain control over the appearance of the completed development. |
| 8. | The surfacing of the turning space and courtyard shall be in accordance
with details that shall have first been submitted to, and approved in
writing by, the Local Planning Authority.
The reason for the condition is:-
To retain control over the appearance of this area. |
| 9. | The sections of new brickwork in House A, and the sections of new garden
wall, shall be constructed in reclaimed materials a sample of which must be
submitted to, and approved in writing by, the Local Planning Authority
along with details of the brick bond, pointing and mortar mix.
The reason for the condition is:-
To ensure these parts of the development fit in acceptably with the
remainder. |
| 10. | Notwithstanding the submitted elevations the livingroom/courtyard doors
in House A shall match the other windows and doors, and the other doors
into the courtyard shall have transom rails which line up with the
adjacent window cills.
The reason for the condition is:-
For the development to accord with the Authority's design requirements. |
| 11. | Vehicular access to the proposed garages and turning area should be
constructed to Norfolk County Council residential access specification for
a distance of 4.5 metres into the site measured from the near edge of the
existing carriageway.
The reason for the condition is:-
To ensure an adequate access. |
| 12. | A sight visibility splay shall be provided at the access to the proposed
garages/turning area 2 metres from the edge of the existing carriageway
to the north-western corner of House A. Any planting/obstructions within
the proposed visibility splay shall not exceed 600mm above the level of the
adjacent carriageway and shall be maintained not exceeding this height
thereafter.
The reason for the condition is:-
In the interests of highway safety. |