Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than two years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2.All new works and works of making good shall be in materials and detailed execution to match the adjoining original fabric except where shown otherwise on the approved drawings. The reason for the condition is:- To preserve the architectural integrity of the listed building.
3.Details of all external joinery, flues, vents and ducts, rain water goods, external doors, facing bricks and roof materials shall be submitted to, and agreed in writing by, the Local Planning Authority prior to being installed or incorporated into the development and the development shall only proceed in accordance with these approved details. The reason for the condition is:- To ensure that appropriate materials are used in the development.
4.No demolitions, stripping out, removal of structural elements, replacement of original joinery or fittings and finishes shall be carried out except where shown and noted on the approved plans. The reason for the condition is:- To preserve as much of the original fabric of the buildings as possible.