| No. | Condition Text |
|---|---|
| 1. | This permission expires on 31st December 1998 and unless on or before this date application has been made for an extension to the period of permission and such application is approved by the Local Planning Authority, the Rubb building shall be removed from the site. The reason for the condition is:- In order to retain control over the building which is constructed of short lived materials and in the interests of the visual amenities of the locality. |
| 2. | The building hereby permitted shall only be used in conjunction with the adjacent haulage depot and worrkshop facility. The reason for the condition is:- To ensure the use of the building takes place in the manner contemplated by the Local Planning Authority on the grant of this permission. |
| 3. | NOTES - Please read the following notes carefully:- The applicabts attention is drawn to the attached comments of the Environment Agency in respect of the proposed development The applicant is further advised that notwithstanding the comments of the Environment Agency that the land on which it is proposed to erect the building has been found to be producing landfill gas in localised pockets. Prior to any consrtruction workbeing carried out, the applicant should carry out a survey of the land to idntify the presence of degradable material or gas under the site of the building. Measures should be incorporated into the building design to exclude the ingress of gas. For further advice on this matter it is suggestted you contact the Borough Environmental Health Officer. |