Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than five years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2.The development hereby permitted shall be carried out in accordance with the plans, numbered "Sheet 1/2" and "Sheet 2/2", amended on 9th February 1998 and received by the Local Planning Authority on 10th February 1998, and the subsequent revisions to these plans dated 17th February 1998. The reason for the condition is :- To ensure the permission relates to the correct documents.
3.The holiday units shall not be occupied until the proposed vehicular access and visibility splay have been configured in accordance with the revision to "Sheet 1/2" dated 17th February 1998. The visibility splay shall be kept free of any obstruction in excess of 0.6 metres above the level of the adjoining carriageway. The reason for the condition is :- In the interests of highway safety. continued on next page :-
4.The holiday units shall not be occupied until the proposed vehicular access has been constructed in accordance with Norfolk County Council's residential access specification for a distance of 4.5 metres measured (into the site) from the near edge of the adjoining carriageway. The reason for the condition is :- In the interests of highway safety.
5.The holiday units shall not be occupied until the car parking area indicated on the revision to "Sheet 1/2" dated 17th February 1998, together with the associated driveway and turning area, have been drained and surfaced in accordance with details to be submitted to and approved by the Local Planning Authority, and that (combined) area shall not thereafter be used for any purpose other than the parking and manoeuvring of vehicles. The reason for the condition is :- To provide for the parking of vehicles off the highway and to enable vehicles to enter and leave the site in a forward gear in the interests of highway safety.
6.The holiday units shall not be occupied until the sub-station has been removed and the proposed "passing place" indicated on the revision to "Sheet 1/2" dated 17th February 1998 has been drained and surfaced in accordance with details to be submitted to and approved by the Local Planning Authority. The reason for the condition is :- In the interests of highway safety.
7.All planting comprised in the scheme of landscaping indicated on the revision to "Sheet 1/2" dated 17th February 1998 shall be carried out in the first planting season following the occupation of the buildings or the completion of the development, whichever is the sooner; and any trees which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation. The reason for the condition is :- In the interests of the visual amenities of the locality.
8.The holiday units shall not be occupied by any individual or family group for a period in excess of 21 days in any twelve month period. The reason for the condition is :- The site lies outside any area in which the Local Planning Authority would normally permit residential development. continued on next page :-
9.NOTE - Please read the following note carefully:-
10.The Council's Access Officer has requested that the following be incorporated in the proposed development in the interests of people with disabilities :- (i) ramped approaches, (ii) level standings at doorways, (iii) flush thresholds, and (iv) wide (minimum 838mm) easy to open doors.