Great Yarmouth Borough Council Portal
No.Condition Text
1.The development shall be carried out in accordance with the revised plan received by the Local Planning Authority on 4th July 1997. The reason for the condition is :- For the avoidance of doubt.
2.This permission expires on 31st March 1998 and unless on or before this date application has been made for an extension to the period of permission and such application is approved by the Local Planning Authority, the diesel tank shall be removed from the site. The reason for the condition is:- In order to retain control over the use of the site which has the benefit of a temporary planning permission.
3.NOTES - Please read the following notes carefully:- The Environment Agency comment as follows on the proposal:- Any facilities for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound should be at least equivalent to the capacity of the tank plus 10% If there is multiple tankage, the compound should be at least equivalent to the capacity of the largest tank, or the combined capacxity of inter- connected tanks, plus 10%. All filling points, vents, gauges and sight glasses must be located within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework should be located above ground and protected from accidental damage. All filling points and tank overflow pipe outlets should be detailed to discharge downwards into the bund. To prevent pollution of the water environment.