| 2. | NOTES - Please read the following notes carefully:-
The applicant is reminded of the need to submit a planning application in
respect of the provision of any hard surfacing to the yard together with
any wash down areas to be provided.
The Environment Agency advise:- Any facilities, above ground, for the
storage of oils, fuels or chemicals shall be sited on impervious base
and surrounded by impervious walls. The volume of the bunded compound
should be at least equivalent to the capacity of the tank plus 10%. All
filling points, vents, gauges and sight glasses must be located within the
bund. The drainage system of the bund shall be sealed with no discharge
to any watercourse, land or underground strata. Associated pipework should
be located above ground and protected from accidental damage. All filling
points and tank overflow pipe outlet should be detailed to discharge in the
bund.
Prior to being discharged into any watercourse, surface water sewer or
soakaway system, all surface water drainage from parking areas and hard
standings suceptible to oil contamination shall be passed through an oil
seporator designed and constructed to have a capacity and details
compatible with the site being drained. Roof water shall not pass through
the interceptor.
Only clean uncontaminated surface water, should discharge to any soakaway
watercourse or surface water sewer. |