Great Yarmouth Borough Council Portal
No.Condition Text
1.--------------------------------------------------------------------------- Particulars of planning permission reserving details for approval:- Application No.:- 06/95/0936/O Petrol filling station, sales building refuelling area, car wash/jet facilities and parking --------------------------------------------------------------------------- Particulars of details submitted for approval:- means of access, siting, design and external appearance.
2.The development shall be carried out in accordance with the revised plans received by the Local Planning Authority on 30th September 1997 location plan; 14th August 1997 site layout, access and elevational drawings. The reason for the condition is :- For the avoidance of doubt.
3.The site shall not be brought into use until such time as highway improvement works to Gapton Hall Road have been carried out and completed to the specification and satisfaction of the Local Planning Authority in consultation with the Highway Authority and secured by a Section 106 Agreement. The reason for the condition is:- To ensure the provision of satisfactory highway approaches to the proposed development.
4.No development shall take place until there has been submitted to and approved by the Local Planning Authority a scheme of landscaping, which shall include indications of all existing trees and hedgerows on the land, and details of any to be retained, together with measures for their protection in the course of development. The reason for the condition is:- In the interests of the visual amenities of the locality.
5.No work shall commence until the exact type and colour of the facing bricks and roof tiles have been submitted to and approved by the Local Planning Authority. The reason for the condition is :- In the interests of the visual amenities of the area as precise details of these materials have not been submitted.
6.Notwithstanding the details shown on the approved drawing details of the type and location of fencing on the site shall be submitted to and agreed in writing with the Local Planning Authority. The reason for the condition is:- In the interests of the appearance of the site and for the avidance of doubt.
7.Foul drainage shall not be discharge other than to the foul sewer. Surface water drainage shall be discharged in accordance with details to be submitted to and approved by the Local Planning Authority before any work takes place on site. The reason for the condition is:- In order to effect satisfactory drainage arrangements both on and from the site and to avoid problems of pollution of nearby water courses.
8.No direct pedestrian or vehicular access shall be formed between the Trunk Road and the application site. The reason for the condition is:- In the interests of highway safety.
9.Before the development is commenced a scheme of planting and landscaping shall be submitted for the approval of the Local Planning Authority and the planting of trees and shrubs shall be carried out in accordance with the scheme as approved within six months of the approval. Any trees and shrubs so planted which dies within 5 years shall be replaced within one year by the applicants or their sucessors in title. The reason for the condition is:- To enhance the visual amenities of the locality
10.NOTES - Please read the following notes carefully:- The applicant is reminded of the need to comply fully with the requirements of conditions 3, 4, 5, 6, 7 & 8 of planning permission reference number 06/95/0936/O. This permission does not purport to convey advertisement consent for the signs shown on the approved drawing. The applicant is reminded of the comments of the Fire Officer in respect of the operation of the site when a tanker is unloading at the site. The applicants attention is drawn to the requirements of Anglian Water referred to in the attached letter dated 19th June 1997. The Environment Agency advise that formal consent is required irrespective of any Town and Country Planning Act approvals/permissions. Consent is not implied by these conditions. Land Drainage Act - Any culverting works affecting the flow of a water- course requires the prior written Consent of the Environment Agency under the terms of the Land Drainage Act/Water Resources Act 1991. The Environment Agency seeks to avoid culverting, and its consent for such works will not normally be granted except as a means of access. All foul sewerage of trade effluent, including cooling water containing chemical additives, or vehicle washing water, including steam cleaning effluent shall be discharged to the foul sewer. Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from parking areas and hard standings suceptible to oil contamination shall be passed through an oil separator designed and constructed to have a capacity and details compatible with the site being drained. Roof water shall not pass through the interceptor. Surface water drainage from under canopy forecourt areas and refuelling/ delivery points, must pass through a full retention oil/petrol separator, (with a minimum capacity which is adequate to contain at least the maximum contants of a compartment of a road tanker likely to deliver petrol/diesel to the filling station), prior to being discharged to any watercourse, surface water sewer, soakaway or foul sewerage system. Vehicle loading or unloading bays and storage areas involving chemicals, refuse or other polluting matter, shall not be connected to the surface water sewer.
11.The Council's Access Officer has requested that the following items be incorporated in the proposed development in the interests of people with disabilities :- (i) level or ramped approaches to all doorways (1:20 maximum slope preferred), (ii) level standing at doorways, (iii) flush thresholds, (iv) wide (900mm preferred, 838mm minimum) easy to open doors, and (v) toilet (disabled included) to be fitted out to part "M" of the Building Regulations.