| No. | Condition Text |
|---|
| 1. | The permission must be begun not later than twelve months from the date
of this permission.
The reason for the condition is:
Required to be imposed pursuant of Section 91 of the Town and Country
Planning Act 1990 and to enable the condition of the building to be
monitored in respect of future renewals of consent. |
| 2. | Notwithstanding the provisions of the Town and Country Planning (General
Permitted Development) Order 1995 (or any order revoking or re-enacting
the Order) no extensions shall be built or windows inserted into the walls
or roof of the dwelling.
The reason for the condition is:-
In the interests of the residential amenities of the occupiers of the
adjacent property and to preserve the character of the listed building. |
| 3. | Prior to the commencement of the development a timetable for completion
shall be submitted to, and approved in writing by, the Local Planning
Authority and the development shall be completed in accordance with this
agreed timetable.
The reason for the condition is:-
To ensure the development, once commenced, is completed by an agreed date
in the interests of securing the preservation of the listed building. |
| 4. | All new building works, and works of making good, shall be in the same
materials and detailed execution to match the adjoining original fabric
except where shown otherwise on the approved drawings.
The reason for the condition is:-
In order to preserve the character and appearance of the listed building. |
| 5. | Notwithstanding the submitted plans the brick chimney shall be replaced
by a metallic flue, the details of which shall be submitted to, and agreed
in writing by, the Local Planning Authority.
The reason for the condition is:-
To create a less domesticating effect and to better preserve the
agricultural character of the building. |
| 6. | Prior to the commencement of the development hereby approved a full
structural survey of the building shall be submitted to, and approved in
writing by, the Local Planning Authority showing where any demolition or
removal of structural elements is necessary and the development shall
proceed in accordance with these approved details.
The reason for the condition is:-
To clarify the amount of, and reduce any unnecessary, demolition and
rebuilding work so as to preserve the integrity of the building as far as
possible. |
| 7. | The barn shall be kept wind and weather tight by means of temporary urgent
works maintained in an effective manner until the permanent work begins
in accordance with details that shall have the prior written approval of
the Local Planning Authority.
The reason for the condition is:-
To ensure the protection of the listed building. |
| 8. | No development shall take place until there has been submitted to and
approved by the Local Planning Authority a scheme of landscaping, which
shall include indications of all existing trees and hedgerows on the land,
and details of any to be retained, together with measures for their
protection in the course of development.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 9. | All planting, seeding or turfing comprised in the approved details of
landscaping shall be carried out in the first planting and seeding season
following the occupation of the building or the completion of the
development, whichever, is the sooner, and any trees or plants which within
a period of 5 years from the completion of the development die, are removed
or become seriously damaged or diseased shall be replaced in the next
planting season with others of similar size and species, unless the Local
Planning Authority gives written consent to any variation.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |