| No. | Condition Text |
|---|
| 1. | All work within, or deliveries to, the compound shall cease on or before
31st July, 1997 and the site shall be cleared of all plant, machinery and
materials within 3 months of that date.
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby
property and in the interests of the visual amenities of the locality. |
| 2. | No work shall be carried out on the site and/or deliveries shall be made
to the site before 7.00 a.m. or after 10.00 p.m. on weekdays and Saturdays,
nor at any time on Sundays.
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby
property. |
| 3. | No storage of materials and equipment or parking of vehicles shall take
place outside the site compound.
The reason for the condition is :-
In the interests of highway safety and in the interests of the residential
amenities of the occupiers of nearby property.
continued on next page :- |
| 4. | The existing post and wire fence around the compound shall be retained
for the duration of the work in connection with the construction of the
gabion cliff stabilisation.
The reason for the condition is :-
In the interests of the terrestrial ecology of the area. |
| 5. | The existing lockable barrier(s) at the southern end of the access road(s)
shall be retained.
The reason for the condition is :-
To ensure the access to the site is restricted to authorised personnel. |
| 6. | Within 3 months of the date of this permission a detailed scheme for the
restoration of the site to natural habitat shall be submitted for the
approval of the Local Planning Authority in conjunction with the Norfolk
Wildlife Trust.
The reason for the condition is :-
In the interests of the terrestrial ecology of the area as the site of the
compound is located within a County Wildlife Site. |
| 7. | The scheme for the restoration of the site to natural habitat comprised in
the approved details shall be completed on or before 31st May, 1998; and
any trees or plants which within a period of 5 years from that date die,
are removed or become seriously damaged or diseased shall be replaced in
the next planting season with others of similar size and species, unless
the Local Planning Authority gives written consent to any variation.
The reason for the condition is :-
In the interests of the terrestrial ecology of the area as the site of the
compound is located within a County Wildlife Site. |
| 8. | NOTES - Please read the following notes carefully:- |
| 9. | 1. The contractor should take all reasonable steps to ensure that all
plant and machinery is well maintained and the operation should be run
with a view to the noise control principles laid down in BS5228 : Noise
Control on Construction Sites. Where available silenced plant should be
chosen and the contractor should provide suitable acoustic screening to
static plant if necessary.
2. A supply of water should be available to dampen down in the event of
excessive airborne dust arising from, for example, crushing plant.
3. All storage of chemicals or diesel oil should be in properly bunded
areas, the bund capable of holding 110% of the volume of the storage tanks
within.
continued on next page :- |
| 10. | 4. Artificial and security lighting should be properly angled away from
nearby dwellings.
5. If contractors are to live on the site temporarily, adequate provision
must be made for drainage.
6. The applicant should be made aware that the recovery of expences due
to extraordinary traffic, by Norfolk County Council as the Highway
Authority, will be borne by the applicant in accordance with Section 59
of the Highways Act 1980. |
| 11. | 7. The contractor should produce relevant public information to make
residents fully aware of the nature of the works proposed and the transport
routes to be used. The name and telephone number of a person who can act
as a link or liaison officer between residents and the contractor should
also be produced.
8. Vehicle and plant movements should take account of public safety.
9. Any rock crushing machinery should be sited well away from residential
accommodation. |