Great Yarmouth Borough Council Portal
No.Condition Text
1.The Go-Kart track shall not be brought into use until an acoustic barrier, to enclose the west side of the track and, at a minimum, half its north and south sides, has been constructed in such a manner as to provide a minimum reduction of sound levels from the track of 9.8 dBA. Full details of the barrier to be constructed shall be submitted for the prior approval of the Local Planning Authority. The reason for the condition is :- In the interests of the residential amenities of the occupiers of nearby properties.
2.The Go-Kart track, Quad-Motocycle track and Abseil Tower shall not operate between the hours of 6.00 p.m. and 10.00 a.m. The reason for the condition is :- In the interests of the residential amenities of the occupiers of nearby properties.
3.No more than 6 Go-Karts and 1 Quad-Motorcycle, used under supervision, shall operate at any one time. Go-Kart engines shall be fitted with properly designed silencers and each Go-Kart shall be capable of producing a sound level measured as a 15 minute LAeq of no more than 57.1, at a distance of 18m from the track edge. The reason for the condition is :- In the interests of the residential amenities of the occupiers of nearby properties. continued on next page :-
4.All oil, fuel or chemicals storage tanks, ancillary handling facilities and equipment including pumps/valves shall be contained within an impervious bunded area of at least 110% of the tank capacity (or largest tank if multiple storage). The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework should be located above ground and protected from accidental damage. All filling points and tank overflow pipe outlets should be detailed to discharge downwards into the bund. The reason for the condition is :- To prevent pollution of the water environment.
5.This permission expires on 17th October 1998 and unless on or before this date application has been made for an extension to the period of permission and such application is approved by the Local Planning Authority, the use shall be discontinued and all buildings and structures shall be removed from the site. The reason for the condition is :- To enable the Local Planning Authority to be in position to review the matter within a reasonable period when the use hereby permitted has been experienced.
6.NOTES - Please read the following notes carefully:-
7.1. Attention is drawn to the "Informatives and Recommendations" (circled paragraphs) included in the attached letter from the Environment Agency. 2. The Council's Access Officer has requested that full access and facilities for children and adults with disabilities be provided.