| No. | Condition Text |
|---|
| 1. | The development must be begun not later than five years beginning with the
date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 91 of the Town and Country
Planning Act 1990. |
| 2. | All new works, and works of making good, shall be in materials and
detailed execution to match the adjoining original fabric except where
shown otherwise on the approved drawings.
The reason for the condition is:-
To preserve the architectural integrity of the Listed Building. |
| 3. | No demolitions, stipping out, removal of structural elements, replacement
of original joinery or fittings and finishes shall be carried out except
where shown and noted on the approved drawings.
The reason for the condition is:-
To preserve the valuable internal features of the Listed Building. |
| 4. | A detailed record drawing of the original structure indicating clearly the
elements to be removed or relocated shall be submiied to and approved by
the Local Planning Authority before any demolition or stripping out takes
place.
The reason for the condition is:-
To ensure the building is recorded adequately prior to the development. |
| 5. | Details of the following items shall be submitted to and approved in
writing by the Local Planning Authority before work on that part of the
development takes place - joinery, iron-mongery, doors, gates, cupboards,
boxing in, plastering specifications, floor details, soil and vent pipes,
boiler flues, extract fans, stairs, internal drainage to attic level,
repairs to external walls and existing beams and woodwork.
The reason for the condition is:-
To ensure the Authority retains control over the execution of these
aspects. |