No.Condition Text
1.The development must be begun not later than five years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2.No development shall commence on the site until detailed drawings providing for the formation of a turning area suitable for the type of vehicles to be accommodated in the workshop have been submitted to and approved by the Local Planning Authority.The turning area as may be approved shall be completed before the workshop is brought into operation and thereafter shall be kept clear of obstruction and available for use at all times. The reason for the condition is :- To enable vehicles to enter and leave the site in a forward gear in the interests of highway safety. Continued on next page.
3.Any facilities for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls.The volume of the bunded compound should be at least the equivalent to the capacity of the tank plus 10%.If there is multiple tankage, the compound should be at least the equivalent to the capacity of the largest tank,or the combined capacity of interconnected tanks, plus 10%.All filling points, vents, gauges and sight glasses must be located within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata.Associated pipework should be located above ground and protected from accidental damage.All filling points and tank overflow pipe outlets should be detailed to discharge downwards into the bund. The reason for the condition is :- To prevent pollution of the water environment. Informative Note. The applicant's attention is drawn to the attached letter from the Environment Agency and the need to comply fully with their requirements.