Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than five years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2.The development shall be carried out in accordance with the revised plan received by the Local Planning Authority on 20th December 1996 and elevational drawing received on 9th December 1996. The reason for the condition is:- For the avoidance of doubt.
3.No work shall commence on the installation of windows in the building until full details of the type of frames have been submitted to and approved in writing by the Local Planning Authority. The reason for the condition is:- Due the submission of inadequate details and for the avoidance of doubt.
4.The access shall be constructed in accordance with the details shown on the revised plan received by the Local Planning Authority on 20th December 1996. The reason for the condition is:- In the interests of highway safety.
5.NOTES - Please read the following notes carefully:- The Port Authority advise that any lights which face towards the river need to be designed so that they cannot be confused with navigation lights, mislead navigators or endanger navigation. Any such lights should avoid the use of red and green and should be incapable of flashing, flickering or any ather form of intermittent or interupted operation. The Authority further advise that the owner of the site includes the quay heading, the ownership of which creates a responsibility for the repair, maintenance or replacement of the piling and the maintenance of a safe depth alongside.