Great Yarmouth Borough Council Portal
No.Condition Text
1.Application for approval of reserved matters must be made not later than the expiration of three years beginning with the date of this permission and the development must be begun not later than whichever is the later of the following dates:- a) the expiration of five years from the date of this permission; or b) the expiration of two years from the final approval of the reserved matters or, in the case of approval on different dates, the final approval of the last such matter to be approved. The reason for this condition:- Required to be imposed pursuant to Section 92 of the Town and Country Planning Act 1990.
2.No development whatsoever shall take place until full details of the siting, design, external appearance, means of access and landscaping of the development have been submitted to and approved by the Local Planning Authority and the development shall be carried out strictly in accordance with such approved details. The reason for the condition is:- Such details have not been submitted as part of this application.
3.The development insofar as it relates to the layout of the building and parking arrangements shall be carried out in accordance with revised drawings Nos. 2611-01 and 2611-02 submitted with the applicant's letter dated 13th October 1986, excluding details of the design of the building referred to in the applicant's letter dated 16th December 1992 and in accordance with the site layout plan submitted with the applicants letter dated 26th June 1986 in respect of application no. 06/86/0683/O. The reason for the condition is:- For the avoidance of doubt and in the interests of visual amenity.
4.Before the premises are brought into use the parking area shown on the approved plan shall be levelled, hardened otherwise constructed to the approval of the Local Palnning Authority and thereafter shall be kept clear of obstruction and available for use at all times. The reason for the condition is:- To ensure adequate parking facilities are provided.
5.The foundations of the building shall be constructed so as not to result in any surcharge on the quay heading and so as not to cause any damage or detriment to the ground anchors to the quay heading. The reason for the condition is:- To ensure the existing quay heading is not damaged in any way.
6.NOTES - Please read the following notes carefully:- The applicant is advised that the point of discharge to the public sewer must be approved by Anglian Water Services Limited and that no discharge into the river shall take oplace without the prior approval of the National Rivers Authority. The applicant is further advised that the National Rivers Authority comments as follows:- Under the terms of the Water Resorces Act 1991 and the Land Drainage Act 1991 and the Land Drainage Byelaws, the prior written consent of the Authority is required for any proposed works or structure either affecting or within 9 metres of tidal or fluvial flood defence. The site is below highest recorded tide levels and could be at risk from flooding from breach or overtopping of the defences. Under the terms of the Water Resources Act 1991 and the Land Drainage Byelaws, the prior written consent of the Authority is required for any proposed work or structures in, under, over or within 9 metres of the top of the bank of the main river (River Yare). An acceptable method of foul drainage disposal would be connection to the foul sewer.