| No. | Condition Text |
|---|
| 1. | The development must be begun not later than five years beginning with the
date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 91 of the Town and Country
Planning Act 1990. |
| 2. | The development shall be carried out in accordance with the revised plan
received by the Local Planning Authority on 04-SEP-95.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | No work shall commence until the exact type and colour of the facing bricks
and roof tiles have been submitted to and approved by the Local Planning
Authority.
The reason for the condition is :-
In the interests of the visual amenities of the area as precise details of
these materials have not been submitted. |
| 4. | No development shall take place until there has been submitted to and
approved by the Local Planning Authority a scheme of landscaping, which
shall include indications of all existing trees and hedgerows on the land,
and details of any to be retained, together with measures for their
protection in the course of development.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 5. | All planting, seeding or turfing comprised in the approved details of
landscaping shall be carried out in the first planting and seeding season
following the occupation of the dwelling or the completion of the
development, whichever, is the sooner, and any trees or plants which within
a period of 5 years from the completion of the development die, are removed
or become seriously damaged or diseased shall be replaced in the next
planting season with others of similar size and species, unless the Local
Planning Authority gives written consent to any variation.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 6. | No development shall commence until the footpath area marked on the
attached plan has been upgraded to Highway Authority specification the
details of which shall have the prior written approval of the Local
Planning Authority and the dwelling shall not be occupied until the
footpath has been adopted as highway maintainable at public expense under
Section 37 of the Highways Act 1980.
The reason for the condition is:
To ensure the retention of the footpath. |
| 7. | Prior to the occupation of the dwelling hereby permitted the access gate or
gates hung to open inwards, shall be set back a minimum distance of 4.5
metres from the edge of the adjoining highway carriageway and a hedge,
fence or wall not exceeding 1 metre in height above highway carriageway
level shall be splayed at an angle of 45 degrees from each of the (outside)
gateposts.
The reason for the condtion is:-
To provide for vehicles to stand clear of the highway carrageway in the
interests of highway safety whilst the gates are being opened or closed. |
| 8. | Prior to the occupation of the dwelling hereby permitted a hardened and
levelled turning area shall be provided within the site to the
satisfaction of the Local Planning Authority.
The reason for the condition is:-
To enable vehicles to enter and leave the site in a forward gear in the
interests of highway safety. |