| No. | Condition Text |
|---|
| 1. | The development must be begun not later than five years beginning with the
date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 91 of the Town and Country
Planning Act 1990. |
| 2. | The development shall be carried out in accordance with the revised plan
received by the Local Planning Authority on 12-SEP-95.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | No work shall commence until the exact type and colour of the facing bricks
and roof tiles have been submitted to and approved by the Local Planning
Authority.
The reason for the condition is :-
In the interests of the visual amenities of the area as precise details of
these materials have not been submitted. |
| 4. | The dwelling shall be of single storey construction and notwithstanding
the provisions of the Town and Country Planning General Development Orders,
1988-90, no dormer window or other openings to the roofspace shall be
provided unless otherwise specified in writing by the Local Planning
Authority.
The reason for the condition is:- |
| 5. | No development shall take place until there has been submitted to and
approved by the Local Planning Authority a scheme of landscaping, which
shall include indications of all existing trees and hedgerows on the land,
and details of any to be retained, together with measures for their
protection in the course of development.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 6. | All planting, seeding or turfing comprised in the approved details of
landscaping shall be carried out in the first planting and seeding season
following the occupation of the buildings or the completion of the
development, whichever, is the sooner, and any trees or plants which within
a period of 5 years from the completion of the development die, are removed
or become seriously damaged or diseased shall be replaced in the next
planting season with others of similar size and species, unless the Local
Planning Authority gives written consent to any variation.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 7. | Prior to the occupation of the dwelling hereby approved, the access to
Links Road shall be constructed and drained in accordance with the
submitted plans.
The reason for the condition is;
To ensure the dwelling is served by an acceptable access. |
| 8. | Prior to the occupation of the dwelling hereby approved, visibility splays
at the Links Road junction shall be formed from a point central to the
access and set back 4.5 metres from the carriageway edge to the site
extremity in both directions and this area shall thereafter be maintained
so that there is no visual obstruction exceeding 225mm above the level of
the adjacent carriageway.
The reason for the condition is:
In the interests of highway safety. |
| 9. | Prior to the occupation of the dwelling hereby approved a 2 metre wide
footpath shall be constructed along the Links Road frontage as shown in the
submitted plans in accordance with details that shall be sufficient to
permit its adoption in accordance with the Highway Act.
The reason for the condition is:
To provide the required footpath along Links Road. |
| 10. | Prior to the occupation of the dwelling hereby permitted a hardened and
levelled turning area shall be provided within the site in accordance with
specifications approved in advance in writing by the Local Planning
Authority.
The reason for the condition is:
In the interests of highway safety. |
| 11. | NOTES - Please read the following notes carefully:- |
| 12. | Attention is drawn to the attached comments from the Brough Council's
Access Officer. |