| No. | Condition Text |
|---|
| 1. | The development must be begun not later than five years beginning with the
date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 91 of the Town and Country
Planning Act 1990. |
| 2. | Any facilities for the storage of oils, fuels or chemicals shall be sited
on impervious bases and surrounded by impervious bund walls. The volume of
the bunded compound should be at least equivalent to the capacity of the
tank plus 10%. If there is multiple tankage, the compound should be at
least equivalent to the capacity of the largest tank, or the combind
capacity of interconnected tanks, plus 10%. All filling points, vents,
gauges and site glasses must be located within the bund. The drainage
system of the bund shall be sealed with no discharge to any watercourse,
land or underground strata. Associated pipework should be located above
ground and protected from accidental damage. All filling points and tank
overflow pipe outlets should be detailed to discharge downwards into the
bund.
The reason for the condition is:-
To prevent pollution of the water environment. |
| 3. | Prior to being discharged into any watercourse, surface water sewer or
soakaway system, all surface water drainage from parking areas and
hardstandings shall be passed through an oil interceptor designed and
constructed to have a capacity and details compatible with the site being
drained. Roof water shall not pass through the interceptor.
The reason for the condition is:-
To prevent pollution of the water environment. |
| 4. | NOTES - Please read the following notes carefully:-
Note from the National Rivers Authority
An acceptable method of foul drainage disposal would be connection to the
foul sewer. The above comment also includes all trade effluent &
contaminated surface water.
Culverting or altering a watercourse in any way requires the prior written
formal consent of the NRA under the Land Drainage Act 1991.
Note from the Access Officer concerning access for people using wheel
chairs
a) All kerbs are to be kept flush with both adjacent surfaces
b) All slopes to be non slip and shallow 1:20 preferred 1:12 maximum.
The Chief Building Control Officer comments that the original building was
designed to have full gas detection/extraction system and any extension
may need to contain such provision.
The applicant is reminded that the additional workshop impinges upon the
land used to accommodate temporary office units and this permission does
not purport to convey any permission for their re-siting. |