1.The development must be begun not later than five years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2.A detailed landscaping scheme showing the treatment of all areas of hard and soft landscaping,including the erection of any means of enclosure of the site shall be submitted to and approved by the Local Planning Authority before any part of the development is commenced.The hard landscaping shall be completed in accordance with the scheme as may be approved before any part of the development is brought into use and the planting shall be completed within one year from the date on which any part of the development is first brought into use. The reason for the condition is :- In the interests of the visual amenities of the area.
3.No work shall commence until details of the exact type and colour of the facing bricks and roof tiles have been submitted to and approved by the Local Planning Authority. The reason for the condition is :- In the interests of the visual amenities of the locality as no details of the materials have been submitted.
4.Before any part of the development is first brought into use the parking areas shall be surfaced and marked out in accordance with plan No.1113/1 and the parking spaces,not exceeding 16 in number,to be let to persons unconnected with the development shall be agreed with the Local Planning Authority and there after all the parking spaces shall be kept clear of obstruction and available for use at all times. The reason for the condition is :- To ensure that adequate off-street parking facilities are provided in accordance with the Council's adopted standards to meet the needs generated by the development and for the avoidance of doubt.
5.Before the development is first brought into use the site access shall be laid out as shown on plan No.1113/1 and shall be provided with visibility splays to the site extremities from a setback of 4.5 metres into the access from the nearer carriageway edge and the land comprised within the splays shall not exceed 225 mm.above carriageway level. The reason for the condition is :- For the avoidance of doubt and in the interests of highway safety.
6.The entrance shall be constructed with :- a)ramped approaches b)level standings at doorways c)flush thresholds and d)wide (900mm.) easy to open doors and, e)the lift shall be provided with a 800mm. clear door opening. The reason for the condition is :- To ensure that the building is fully 'accessible' in the interests of disabled persons.
7.Before any development is commenced the footway along the frontage to North Quay shall be improved to a uniform width of 2.0 metres and the footway and new vehicular access shall be constructed to the Norfolk County Council's specification. The reason for the condition is :- In the interests of pedestrian and highway safety.
8.NOTES - Please read the following notes carefully:- a) the Council's Access Officer has commented that in the interests of the disabled a unisex w.c. should be provided as shown on the attached plan. b) The National Rivers Authority has indicated that,under the terms of the Water Resources Act 1991 and the Land Drainage Byelaws, the prior written consent of the Authority is required for any proposed works or structures either affecting or within 9 metres of the tidal or fluvial flood defence,that the site is below highest recorded tide levels and could be at risk from floodingfrom breach or overtopping of the defences, that the site lies within an area subject to tidal flooding which is protected by defences designed to a 1:200 year return period and that an acceptable method of foul drainage disposal would be connection to the foul sewer. c) This permission relates to the amended scheme as shown on drawings Nos.1113/1,2,3,4,5,6 and 7 received by the Local Planning Authority on 10th.March 1997.