Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than five years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2.The access gate or gates,hung to open inwards,shall be set back a minimum distance of 4.5 metres from the edge of the adjoining highway carriageway and a hedge ,fence or wall not exceeding 1 metre in height above highway carriageway level,shall be splayed at an angle of 45 degrees from each of the (outside) gate posts in accordance with details to be submitted to and approved by the Local Planning Authority before any work is commenced.The access shall be constructed in accordance with the details as may be approved and in accordance with the N.C.C. residential access specification prior to the occupation of the dwelling. The reason for the condition is :- To provide for vehicles to stand clear of the highway carriageway in the interests of highway safety whilst the gates are being opened or closed.
3.Prior to the occupation of the dwelling hereby approved the turning area shown on the approved plan shall be constructed to the approval of the Local Planning Authority. The reason for the condition is :- To enable vehicles to enter and leave the site in a forward gear in the interests of highway safety.
4.Before any work is commenced details of any means of enclosure to be erected in front of the existing hedge which is shown as being retained shall be submitted to and approved by the Local Planning Authority. The reason for the condition is :- In the interests of highway safety and the visual amenities of the area.