| No. | Condition Text |
|---|
| 1. | The development must be begun not later than five years beginning with the
date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 91 of the Town and Country
Planning Act 1990. |
| 2. | The development hereby permitted shall be carried out in accordance with
the amended plan, Job No. 2103 amended 5th June, 1995, received by the
Local Planning Authority on 8th June, 1995.
The reason for the condition is :-
For the avoidance of doubt and in the interests of the visual amenities of
the locality. |
| 3. | The building hereby permitted shall be used solely in connection with the
agricultural use of the land and for no other purpose.
The reason for the condition is :-
To ensure that the building is not used for any purpose that would be
unsuitable in this rural locality. |
| 4. | Any facilities for the storage of oils, fuels or chemicals shall be sited
on impervious bases and surrounded by impervious bund walls. The volume of
the bunded compound should at least equivalent to the capacity of the tank
plus 10%. If there is multiple tankage, the compound should be at least
equivalent to the capacity of the largest tank, or the combined capacity of
interconnected tanks, plus 10%. All filling points, vents, gauges and
sight glasses must be located within the bund. The drainage system of the
bund shall be sealed with no discharge to any watercourse, land or
underground strata. Associated pipework should be located above ground and
protected from accidental damage. All filling points and tank overflow
pipe outlets should be detailed to discharge downwards into the bund.
The reason for the condition is :-
To prevent pollution of the water environment. |
| 5. | There shall be no discharge of foul or contaminated drainage from the site
into either groundwater or any surface waters, whether direct or via
soakaways.
The reason for the condition is :-
To prevent pollution of the water environment. |
| 6. | ATTENTION IS DRAWN TO THE FOLLOWING INFORMATIVES AND RECOMMENDATIONS
RECEIVED FROM THE NATIONAL RIVERS AUTHORITY (ANGLIAN REGION) :- |
| 7. | The facilities must comply with the Control of Pollution (Silage, Slurry
and Agricultural Fuel Oil) Regulations 1991.
Any fertilizer storage facilities must be sited in properly constructed
bunded areas of sufficient capacity to avoid contamination of any
watercourse, surface water drains or water source in the event of spillage.
Agrochemicals and pesticides should be stored and used in such a manner so
that pollution of surface or groundwater cannot occur.
The site must be drained by a separate system of foul and surface water
drainage, with all clean roof and surface water being kept separate from
foul water. |