| No. | Condition Text |
|---|
| 1. | The development must be begun not later than five years beginning with the
date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 91 of the Town and Country
Planning Act 1990. |
| 2. | Prior to being discharged into any watercourse, surface water sewer or
soakaway system, all surface water drainage from parking area and hard-
standings shall be passed through an oil interceptor designed and
constructed to have a capacity and details compatible with the site being
drained. Roof water shall not pass through the interceptor.
The reason for the condition is:-
To prevent pollution of the water environment. |
| 3. | No work shall commence until the exact type and colour of the facing bricks
and roof tiles have been submitted to and approved by the Local Planning
Authority.
The reason for the condition is :-
In the interests of the visual amenities of the area as precise details of
these materials have not been submitted. |
| 4. | NOTES - Please read the following notes carefully:- |
| 5. | The Council's Access Officer has requested that the needs of wheel chair
users be taken into account, as follows:-
a) Ramped approaches
b) Level stanings at doorways
c) Flush thresholds
d) Wide (900mm) easy to open doors
e) The toilet in accordance with part 'M' of the Building Regulations for
people who use wheel chairs. |