| No. | Condition Text |
|---|
| 1. | The development must be begun not later than five years beginning with the
date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 91 of the Town and Country
Planning Act 1990. |
| 2. | Within two months of the date of this permission,or such longer period as
may be agreed in writing with the Local Planning Authority,a detailed
planting scheme providing for a substantial reinforcement of the existing
shrub planting along the northern boundary of the site with standard/half-
standard size trees shall be submitted to and approved by the Local
Planning Authority and all planting in accordance with the scheme as may be
approved shall be completed before 28th.February 1996.
The reason for the condition is :-
To ensure that an adequate screen is provided between the site and the
adjoining open countryside in the interests of the visual amenities of the
area. |
| 3. | Within two months of the date of this permission 36 of the car parking
spaces shown on the plan received with the applicants letter on 15th.
December 1994 shall be levelled,hardened and surfaced to the approval of
the Local Planning Authority and the remainder of the 45 car parking spaces
shown on the same plan shall be levelled,hardened and surfaced to the
approval of the Local Planning Authority before the workshop hereby
approved is first brought into use.
The reason for the condition is :-
For the avoidance of doubt and to ensure that adequate off-street parking
space is provided to serve the existing and proposed buildings. |
| 4. | If at any time it is deemed that the parking provision shown on the plan
received by the local Planning Authority on 15th.December 1994 is
inadequate to cater for the traffic movements generated by the use of
the site 18 additional parking spaces shall be formed to accord with the
Council's adopted standards.
The reason for the condition is :-
In order to ensure satisfactory off-street parking to meet the needs
generated by the development in the interests of highway safety. |
| 5. | Within six months of the date of this permission,or such longer period as
may be agreed in writing,the site access road shall be constructed between
the parking area adjacent to the existing office accommodation and the
estate road in accordance with details to be submitted to and approved by
the Local Planning Authority.
The reason for the condition is :-
To ensure the provision of satisfactory highway approaches to and within
the site in the interests of highway safety. |
| 6. | Before the workshop hereby approved is first brought into use the site
access road between the east end of the building and the estate road shall
be constructed in accordance with details to be submitted to and approved
by the Local Planning Authority.
The reason for the condition is :-
To ensure the provision of satisfactory highway approaches to the
development in the interests of highway safety. |
| 7. | Within three months of the date of this permission,or such longer period
as may be agreed in writing,details of the surfacing work to be carried
out together with the phasing of such work shall be submitted to and
approved by the Local Planning Authority and the work shall not be carried
out other than in accordance with the details as may be approved.
The reason for the condition is :-
For the avoidance of doubt as no such details were submitted as part of
the application. |
| 8. | No development approved by this permission shall be commenced until a
scheme for the disposal of foul and surface water has been implemented in
accordance with details to be submitted to and approved by the Local
Planning Authority in consultation with the N.R.A.
The reason for the condition is :-
To prevent pollution of the water environment. |
| 9. | Prior to being discharged into any watercourse, surface water sewer or
soakaway system, all surface water drainage from parking areas and
hardstandings shall be passed through an oil interceptor designed and
constructed to have a capacity compatible with the site being drained.Roof
water shall not pass through the interceptor.
The reason for the condition is :-
To prevent pollution of the water environment. |
| 10. | Adequate measures shall be taken to ensure that no nuisance is caused to
occupiers of neighbouring sites from grit, dust, fumes, odour, droplets or
any other means.
The reason for the condition is :-
To prevent injury to the amenities of the area. |
| 11. | This permission insofar as it relates to the portacabin offices and
containers is for a temporary expiring on 1st.January 1997 and unless on or
before that date application is made for an extension of the period of
permission and such application is approved by the Local Planning Authority
the structures shall be removed.
The reason for the condition is :-
In order to retain control over the buildings which are of a temporary
nature and in the interests of the visual amenities of the area. |
| 12. | The temporary office accommodation hereby approved shall only be used by
Rigblast Services Limited in connection with the operations carried on
within the site and shall not be let as separate office accommodation.
The reason for the condition.
to ensure that the use of the site takes place in the manner contemplated
by the Local Planning Authority on the grant of this permission.
Informative Notes.
a) The applicant's attention is drawn to the attached
letter from the National Rivers Authority and the need to fully comply
with their requirements.
b) The applicant is reminded that the temporary consent
in respect of the former Super Serv portacabin offices has expired and
that their use must be discontinued. |