| No. | Condition Text |
|---|
| 1. | The development must be begun not later than five years beginning with the
date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 91 of the Town and Country
Planning Act 1990. |
| 2. | The development hereby permitted shall be carried out in accordance with
Drawing Nos. 375/1D and 375/3.
The reason for the condition is :-
To ensure the permission relates to the correct documents and in the
interests of highway safety. |
| 3. | Within one month of the commencement of the development hereby permitted
full details of the scheme of landscaping shown on Drawing No. 375/1D,
including the numbers and species of trees and/or shrubs to be planted,
shall be submitted for the approval of the Local Planning Authority.
The reason for the condition is :-
In the interests of the visual amenities of the locality. |
| 4. | All planting, seeding or turfing comprised in the approved details of
landscaping shall be carried out in the first planting and seeding season
following the recommissioning of any part of the site or the completion of
the development, whichever is the sooner, and any trees or plants which
within a period of 5 years from the completion of the development die, are
removed or become seriously damaged or diseased shall be replaced in the
next planting season with others of similar size and species, unless the
Local Planning Authority gives written consent to any variation.
The reason for the condition is :-
In the interests of the visual amenities of the locality. |
| 5. | The site shall not be recommissioned until the access and egress
improvements have been carried out in accordance with detailed
specifications to be submitted to and approved by the Local Planning
Authority in conjunction with the Highway Authority.
The reason for the condition is :-
In the interests of highway safety. |
| 6. | The site shall not be recommissioned until the car parking area shown on
Drawing No. 375/1D has been drained and surfaced, and that area shall not
thereafter be used for any purpose other than the parking of employees' and
customers' vehicles.
The reason for the condition is :-
To ensure that adequate parking facilities are provided. |
| 7. | Any facilities for the storage of oils, fuels or chemicals shall be sited
on impervious bases and surrounded by impervious bund walls. The volume of
the bunded compound should be at least equivalent to the capacity of the
tank plus 10%. If there is multiple tankage, the compound should be at
least equivalent to the capacity of the largest tank, or the combined
capacity of interconnected tanks, plus 10%. All filling points, vents,
gauges and sight glasses must be located within the bund. The drainage
system of the bund shall be sealed with no discharge to any watercourse,
land or underground strata. Associated pipework should be located above
ground and protected from accidental damage. All filling points and tank
overflow pipe outlets should be detailed to discharge downwards into the
bund.
The reason for the condition is :-
To prevent pollution of the water environment. |
| 8. | Prior to being discharged into any watercourse, surface water sewer or
soakaway system, all surface water drainage from parking areas and
hardstandings shall be passed through an oil interceptor designed and
constructed to have a capacity and details compatible with the site being
drained. Roof water shall not pass through the interceptor.
The reason for the condition is :-
To prevent pollution of the water environment. |
| 9. | No development approved by this permission shall be commenced until a
scheme for the disposal of foul and surface waters has been approved by and
implemented to the reasonable satisfaction of the Local Planning Authority.
The reason for the condition is :-
To prevent pollution of the water environment. |
| 10. | NOTES - Please read the following notes carefully:- |
| 11. | 1. Drainage from the area under the canopy should be drained to the foul
sewer with the consent of Anglian Water Plc.
2. All outfall and cross overs will require the consent of the Muckfleet
& South Flegg Internal Drainage Board and may be liable to a consent fee.
The applicants are advised therefore to contact the I.D.B. in respect of
this matter.
3. The Council's Access Officer has, in the interests of people with
disabilities, requested that the following items, together with those
shown on the attached drawing, be incorporated in the development :-
(a) ramped approach to shop 1:20 maximum,
(b) level standing at door,
(c) flush thresholds, and
(d) wide (900mm) easy to open doors. |