| No. | Condition Text |
|---|
| 1. | Application for approval of reserved matters must be made not later than
the expiration of three years beginning with the date of this permission
and the development must be begun not later than whichever is the later of
the following dates:-
a) the expiration of five years from the date of this permission;
or
b) the expiration of two years from the final approval of the reserved
matters or, in the case of approval on different dates, the final approval
of the last such matter to be approved.
The reason for this condition:-
Required to be imposed pursuant to Section 92 of the Town and Country
Planning Act 1990. |
| 2. | No development whatsoever shall take place until full details of the
siting, design, external appearance, means of access and landscaping of
the development have been submitted to and approved by the Local Planning
Authority and the development shall be carried out strictly in accordance
with such approved details.
The reason for the condition is:-
Such details have not been submitted as part of this application. |
| 3. | The details to be submitted shall provide for the construction of a bus
layby on North Quay and the layby shall be completed in accordance with
the details as may be approved before the development is first brought
into use.
The reason for the condition is :-
In the interests of highway safety. |
| 4. | The premises shall not be brought into use until operational and non-
operational parking facilities have been provided in accordance with the
Borough Council's adopted standards.
The reason for the condition is:-
In order to ensure satisfactory off-street parking to meet the needs
generated by the development. |
| 5. | Foul drainage shall not be discharged other than to the foul sewer.
The reason for the condition is:-
In order to effect satisfactory drainage arrangements both on and from the
site and to avoid problems of pollution of nearby water courses. |
| 6. | Prior to the commencement of any development a scheme for the provision
and implementation of a surface water drainage system shall be submitted to
and approved by the Local Planning Authority in consultation with the
National Rivers Authority.
The reason for the condition is :-
To prevent the increased risk of flooding by providing a satisfactory
means of surface water disposal. |
| 7. | Surface water from any impermeable vehicle parking areas and service areas
shall be passed through a storm by-pass oil interceptor which shall be
capable of receiving flows up to 50mm./hour from the connected area with
all flows up to 5mm./hour rainfall passing through the interceptor and
receiving minimum 6 minutes retention in each interception chamber.
The reason for the condition is :-
To prevent pollution of the water environment. |
| 8. | Details providing for the re-surfacing of the footpath between the bridge
and North Quay shall be submitted to and approved by the Local Planning
Authority before any work is commenced and the re-surfacing shall be
completed in accordance with the details as may be approved before the
development is first brought into use.
The reason for the condition is :-
In the interest of pedestrian safety and the visual amenities of the area. |
| 9. | The building shall be designed so as to be acessible by disabled persons
and the development shall provide for suitable toilet and car parking
facilities for the disabled.
The reason for the condition is :-
For the avoidance of doubt.
Informative Note.
The applicant's attention is drawn to the attached letter
from the National Rivers Authority and the need to comply fully with their
requirements. |