Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the following revised plans received by the Local Planning Authority on 29.09.2026: - Existing and Proposed Plans and Elevations. Dwg. No. 2051/3, Rev. A. And the following plans received 14.08.2026: - Proposed Plans and Elevations: Carport and Garage. Dwg. No. 2051/4. The reason for the condition is:- For the avoidance of doubt of what has been approved and in the interests of proper planning.
3.The materials to be used in the external walls and roof of both the front extension and car port and garage hereby permitted shall match those of the existing building in accordance with the details stated in the application form. The materials for the ground surface treatments should also match the existing gravel. The reason for the condition is :- In the interests of the visual amenities of the area in accordance with Local Plan Policies DHE1, HOU11 and HEC7 and in the interests of preserving the positive contribution the subject building makes to the significance of surrounding heritage assets in accordance with Local Plan Policy DHE2.
4.No development above slab level shall take place until detailed drawings/profiles of the proposed windows and doors at a scale of no less than 1:20 have been submitted to and approved in writing by the Local Planning Authority. For the avoidance of doubt the windows and doors shall be of black powder coated aluminium as stated on the approved drawing. The development shall be carried out in accordance with the details as approved and retained as such thereafter. The reason for the condition is :- In the interests of the visual amenities of the area in accordance with Local Plan Policies DHE1, HOU11 and HEC7 and in the interests of preserving the positive contribution the subject building makes to the significance of surrounding heritage assets in accordance with Local Plan Policy DHE2.
5.Throughout the full construction period, a 4m tree protection exclusion zone (measured from each trunk) is to be maintained at the northern and eastern aspect of the two trees to the front of the site. This area is to be clearly demarcated with protective fencing and remain inaccessible to personnel, machinery, equipment, and material storage for the duration of the works. The reason for the condition is :- To safeguard the trees throughout the development process in alignment with Local Plan Policy NAT10.
6.INFORMATIVE: Due to the close proximity of other residential dwellings, the hours of any construction or refurbishment works that are audible outside of the boundary of the site should be restricted to reduce the likelihood of noise disturbance to: 07:30-18:30 Monday to Friday 08:30 hours to 13:30 Saturdays No work on Sundays or Bank Holidays.
7.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.