| No. | Condition Text |
|---|---|
| 1. | Condition 23 of outline pp 06/19/0676/O required details of foul drainage to be submitted to and approved in writing by the Local Planning Authority The following information was submitted: Addendum Drainage Design Statement - Dated April 2026 INFILTRATION BASIN 04 SECTIONS - Drawing No: 47932 RJL 02 XX DR C 1353 Revision P01- Dated April 2026 CONTRIBUTING AREAS PLAN SHEET 1 - Drawing no: 47932 RJL 02 XX DR C 2701 - Revision P01 - Dated April 2026 Addendum Drainage Design Statement - Dated April 2026 - ANNEX A DRAINAGE STRATEGY - Drawing No 47932/C/010 - Revision D - Dated April 2023 DRAINAGE STRATEGY - Drawing No 47932/C/011 - Revision B - Dated April 2023 DRAINAGE STRATEGY - Drawing No 47932/C/012 - Revision B - Dated April 2023 DRAINAGE DETAILS- Drawing No 47932/C/015 - Revision A - Dated April 2023 INFILTRATION BASIN 01 SECTIONS - Drawing No 47932/C/020 - Revision B - Dated April 2023 INFILTRATION BASIN 02 SECTIONS - Drawing No 47932/C/021 - Revision A - Dated April 2023 INFILTRATION BASIN 03 SECTIONS - Drawing No 47932/C/022 - Revision A - Dated April 2023 INFILTRATION BASIN 04 SECTIONS - Drawing No 47932/C/023 - Revision A - Dated April 2023 CONTRIBUTING AREAS PLAN - Drawing No 47932/C/030 - Revision A - Dated December 2023 CONTRIBUTING AREAS PLAN - Drawing No 47932/C/031 - Revision A - Dated December 2023 TOPOGRAPHICAL SURVEY SHEET 2 of 2 ; Drawing Number - X X-47932-PP-SK11 - Dated 04.11.19 Report Title: Phase II Environmental and Geotechnical Report - Version 1 - Dated November 2022 Report Title: Phase II Environmental and Geotechnical Report - Version 1 - Dated November 2022 - Appendix B: Ground Investigation Data - FINISHED FLOOR LEVEL PLAN SHEET 1 - Drawing No. 47932 RJL 02 XX DR C 1101 - Revision P01 - Dated April 2026 FINISHED FLOOR LEVEL PLAN SHEET 1 - Drawing No. 47932 RJL 02 XX DR C 1102 - Revision P01 - Dated April 2026 Upon full assessment of the submitted material supporting the application, taking into account all material considerations, it is considered the requirements of condition 23 have been met, the details can be approved, and the condition can be discharged in PART for Phase 2 and 3 ONLY. The development must now be carried out in full compliance with these details |