| No. | Condition Text |
|---|---|
| 1. | Condition 22 of outline pp 06/19/0676/O required detailed designs of a surface water drainage scheme for that phase incorporating the following measures to be submitted to and agreed with the Local Planning Authority. The following information was submitted: Addendum Drainage Design Statement - Dated April 2026 INFILTRATION BASIN 04 SECTIONS - Drawing No: 47932 RJL 02 XX DR C 1353 Revision P01- Dated April 2026 CONTRIBUTING AREAS PLAN SHEET 1 - Drawing no: 47932 RJL 02 XX DR C 2701 - Revision P01 - Dated April 2026 Addendum Drainage Design Statement - Dated April 2026 - ANNEX A DRAINAGE STRATEGY - Drawing No 47932/C/010 - Revision D - Dated April 2023 DRAINAGE STRATEGY - Drawing No 47932/C/011 - Revision B - Dated April 2023 DRAINAGE STRATEGY - Drawing No 47932/C/012 - Revision B - Dated April 2023 DRAINAGE DETAILS- Drawing No 47932/C/015 - Revision A - Dated April 2023 INFILTRATION BASIN 01 SECTIONS - Drawing No 47932/C/020 - Revision B - Dated April 2023 INFILTRATION BASIN 02 SECTIONS - Drawing No 47932/C/021 - Revision A - Dated April 2023 INFILTRATION BASIN 03 SECTIONS - Drawing No 47932/C/022 - Revision A - Dated April 2023 INFILTRATION BASIN 04 SECTIONS - Drawing No 47932/C/023 - Revision A - Dated April 2023 CONTRIBUTING AREAS PLAN - Drawing No 47932/C/030 - Revision A - Dated December 2023 CONTRIBUTING AREAS PLAN - Drawing No 47932/C/031 - Revision A - Dated December 2023 TOPOGRAPHICAL SURVEY SHEET 2 of 2 ; Drawing Number - X X-47932-PP-SK11 - Dated 04.11.19 Report Title: Phase II Environmental and Geotechnical Report - Version 1 - Dated November 2022 Report Title: Phase II Environmental and Geotechnical Report - Version 1 - Dated November 2022 - Appendix B: Ground Investigation Data - FINISHED FLOOR LEVEL PLAN SHEET 1 - Drawing No. 47932 RJL 02 XX DR C 1101 - Revision P01 - Dated April 2026 FINISHED FLOOR LEVEL PLAN SHEET 1 - Drawing No. 47932 RJL 02 XX DR C 1102 - Revision P01 - Dated April 2026 Upon full assessment of the submitted material supporting the application, taking into account all material considerations, the submitted details listed above are considered to meet the requirements of condition 22 and are hereby approved and the condition can be discharged in PART for Phase 2 and 3 ONLY. The condition cannot be discharged in Full as the development must be built in accordance with the approved drainage scheme prior to first occupation and shall be managed and maintained as such thereafter. |