| 1. | Condition 8 of pp. 06/23/0056/F requires the submission and approval of a Foul Water Drainage Scheme to be based upon the scheme proposed within the approved Flood Risk Assessment and Drainage Strategy ref 211313 Rev 01 dated January 2023, and the Flood Risk Assessment and Drainage Strategy Addendum Report ref EJK/md/211313.1 Rev 0.0 dated 29 May 2024. It also requires that the development is thereafter carried out in strict accordance with the approved foul water drainage scheme details, and the drainage is installed and made available for use prior to the first residential occupation or use of any dwelling within the development.
The following information was submitted:
- 211313-FW Network- Site A & B (15/05/2026)
- SITE B EXTERNAL WORKS GENERAL ARRANGEMENT PLAN SHEET 1 (Dwg. No. C-0101, Rev. P01)
- SITE B EXTERNAL WORKS GENERAL ARRANGEMENT PLAN SHEET 2 (Dwg. No. C-0102, Rev. P01)
- S104 AGREEMENT PLAN SITE B (Dwg. No C-0181, Rev. P02)
- S38 AGREEMENT PLAN SITE B (Dwg. No. C-0152 P02)
- S38 ADOPTABLE ROAD AND SEWER LONG SECTIONS SITE B SHEET 1 (Dwg. No. C-0166, Rev. P02)
- S38 ADOPTABLE ROAD AND SEWER LONG SECTIONS SITE B SHEET 2 (Dwg. No. C-0167, Rev. P02)
- S38 ADOPTABLE ROAD AND SEWER LONG SECTIONS SITE B SHEET 3 (Dwg. No. C-0168, Rev. P02)
- S38 ADOPTABLE ROAD AND SEWER LONG SECTIONS SITE B SHEET 4 (Dwg. No. C-0169, Rev. P02)
- S38 ADOPTABLE ROAD AND SEWER LONG SECTIONS SITE B SHEET 5 (Dwg. No. C-0170, Rev. P02)
- S38 ADOPTABLE ROAD AND SEWER LONG SECTIONS SITE B SHEET 6 (Dwg. No. C-0171, Rev. P02)
- S38 ADOPTABLE ROAD AND SEWER LONG SECTIONS SITE B SHEET 7 (Dwg. No. C-0172, Rev. P02)
- S38 ADOPTABLE ROAD AND SEWER LONG SECTIONS SITE B SHEET 8 (Dwg. No. C-0173, Rev. P02).
- S38 ADOPTABLE ROAD AND SEWER LONG SECTIONS SITE B SHEET 9 (Dwg. No. C-0174, Rev. P02)
- S38 ADOPTABLE ROAD AND SEWER LONG SECTIONS SITE B SHEET 10 (Dwg. No. C-0175, Rev. P02)
- S38 ADOPTABLE ROAD AND SEWER LONG SECTIONS SITE B SHEET 11 (Dwg. No. C-0176, Rev. P02)
Upon full assessment of the submitted plans and consultation with Anglian Water, the submitted information is considered acceptable and approved as sufficient to discharge Condition 8 in Full. The condition now becomes a Compliance condition as this requires that the development is carried out in strict accordance with the approved foul water drainage scheme details, and the drainage is installed and made available for use prior to the first residential occupation or use of any dwelling within the development. |