| 1. | Condition 9 of pp. 06/23/0669/F requires the submission and approval of a Foul Water Drainage Scheme. It also requires that the development is thereafter carried out in strict accordance with the approved foul water drainage scheme details, and the drainage is installed and made available for use prior to the first residential occupation or use of any dwelling within the development.
The following information was submitted:
· S104 AGREEMENT PLAN SITE A (Dwg. No. C-0180, Rev. P03)
· Site A- FW Network. 15/05/2026. (File No. 211313O)
· SITE A EXTERNAL WORKS GENERAL ARRANGEMENT PLAN SHEET 1 (Dwg. No. C-0100, Rev. P01)
· SITE A & B FOUL WATER INSPECTION CHAMBER SCHEDULES (Dwg. No. C-0103, Rev. P01)
· S38 MANHOLE SCHEDULES SHEET 1 (Dwg. No. C-0161, Rev. P03)
· S104 CONSTRUCTION DETAILS SHEET 1 (Dwg. No. C-0183, Rev. P02)
· S104 MANHOLE SCHEDULES SHEET 1 (Dwg. No. C-0182, Rev. P02)
· S104 CONSTRUCTION DETAILS SHEET 2 (Dwg. No. C-0184, Rev. P01)
· S38 ADOPTABLE ROAD AND SEWER LONG SECTIONS SITE A SHEET 1 (C-0163, Rev. P03)
· S38 ADOPTABLE ROAD AND SEWER LONG SECTIONS SITE A SHEET 2 (Dwg. No. C-0164, Rev. P02)
· S38 ADOPTABLE ROAD AND SEWER LONG SECTIONS SITE A SHEET 3 (Dwg. No. C-0165, Rev. P02)
· PRIVATE CONSTRUCTION DETAILS SITE A & B SHEET 1 (Dwg. No. C-0500, Rev. P01)
· PRIVATE CONSTRUCTION DETAILS SITE A & B SHEET 2 (Dwg. No. C-0501, Rev. P01)
Upon full assessment of the submitted plans and consultation with Anglian Water, the submitted information is considered acceptable and approved as sufficient to discharge Condition 9 in Full. The condition now becomes a Compliance condition as this requires that the development is carried out in strict accordance with the approved foul water drainage scheme details, and the drainage is installed and made available for use prior to the first residential occupation or use of any dwelling within the development. |