1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the following revised plans received by the Local Planning Authority on 30/06/2026 - 25261-LSI-UTC-ZZ-D-A-1350-S2-P05 - Proposed Elevations - 25261-LSI-UTC-ZZ-D-A-1352-S2-P04 - Proposed Elevations - Front Entrance - 25261-LSI-UTC-ZZ-D-A-1370-S2-P03 - Proposed Sections - UTC - 25261-LSI-UTC-XX-D-A-1401-S2-P03 - Covered Walkway - 25261-LSI-UTC-XX-D-A-1400-S2-P03 - UTC - 25261-LSI-UTC-XX-D-A-1175-S2-P04 - Block Plan - 25261-LSI-UTC-XX-D-A-1360-S2-P03 - Proposed Covered Walkway - 25261-LSI-UTC-XX-D-A-1170-S2-P04 - Site Location Plan - 25261-LSI-UTC-01-D-A-1305-S2-P03 - Proposed Floor Plan Sheet 01 - 25261-LSI-UTC-01-D-A-1306-S2-P03 - Proposed Floor Plan Sheet 02 - 25261-LSI-UTC-00-D-A-1300-S2-P03 - Proposed Floor Plan Sheet 01 - 25261-LSI-UTC-00-D-A-1301-S2-P03 - Proposed Floor Plan Sheet 02 - 25261-LSI-UTC-00-D-A-1190-S2-P06 - Proposed Landscape Plan - 25261-LSI-UTC-00-D-A-1181-S2-P04 - Proposed Parking Layout - 25261-LSI-UTC- -00-D-A-1311-S2-P01 - Proposed Roof Plan - Planning Statement - Bidwells - June 2026 - Arboricultural Impact Assessment and Method Statement Ref. NWS 1184_AIA JPUH New UTC Building - Biodiversity Method Statement Ref. 65217920-SWE-XX-XX-T-J-0002 Rev. C02 - Biodiversity Net Gain Assessment Ref. 65217920-SWE-XX-XX-T-J-0004 Rev. C03 - Construction Management Plan - western building systems - Design and Access Statement - LSI Architects - Ecological Impact Assessment Ref. 65217920-SWE-XX-XX-T-J-0001 Rev. C04 - Ground Investigation Report Ref. MSH/26.081/Rev01 - Phase 1 Contamination Assessment Ref. MSH/26.081/Phase1/Rev01 - Transport Assessment Ref. 251507 - Tree Protection Plan Ref. TPP 1 - Flood Risk Assessment / Surface Water Drainage Strategy Ref. 251507 - Noise Impact Assessment Ref. 251452 The reason for the condition is:- To define the permission and for the avoidance of doubt.
3.The development shall be carried out in strict accordance with the submitted Construction Management Plan (received 30/06/2026) throughout the entire construction period and use only the specified 'Construction Traffic Access Route' detailed within the submitted Construction Management Plan (received 30/06/2026). The reason for the condition is:- To ensure that the construction phase does not cause an unacceptable impact on the amenity of nearby residents or the safe operation of the surrounding highway network, in accordance with Policies A1 and CS16 of the Core Strategy and Local Plan Part 2, and Policies HEC7 and SUT2 of the Emerging Local Plan.
4.Prior to the first use of the building hereby permitted, a Habitat Management and Monitoring Plan (HMMP) shall be submitted to and approved in writing by the Local Planning Authority. The HMMP shall detail the long-term management and maintenance arrangements for all significant onsite habitat enhancements for a minimum period of 30 years following the completion of the development. The development shall thereafter be managed in strict accordance with the approved HMMP. The reason for the condition is :- To ensure the successful establishment and long-term maintenance of the biodiversity net gain enhancements in accordance with the statutory requirements of Schedule 7A of the Town and Country Planning Act 1990, Policy CS11 of the Core Strategy, and Policy NAT1 of the Emerging Local Plan.
5.All hard and soft landscaping works detailed on the approved landscaping plan (Ref: 25261-LSI-UTC-00-D-A-1190-S2-P06 - Proposed Landscape Plan) shall be carried out within the first planting and seeding seasons following the first occupation of the building or the completion of the development, whichever is the sooner. Any trees or plants which, within a period of 5 years from the completion of the development, die, are removed, or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species. The reason for the condition is :- To ensure the provision, establishment, and maintenance of a reasonable standard of landscape in accordance with the approved designs, Policy CS9 and E4 of the Core Strategy and Local Plan Part 2, and Policy DHE1 of the Emerging Local Plan.
6.Prior to the first use of the Urgent Treatment Centre hereby approved, the reconfigured standard car parking areas and the reprovisioned accessible car parking spaces shall be fully laid out, demarcated, and made available for use in accordance with the approved plans (Plan ref: - 25261-LSI-UTC-00-D-A-1181-S2-P04 - Proposed Parking Layout). These areas shall thereafter be retained for the parking of vehicles in connection with the hospital. The reason for the condition is :- To ensure the permanent availability of the parking and manoeuvring areas, in the interests of highway safety and accessibility, in accordance with Policy CS16 of the Core Strategy, Policy I1 of the Local Plan Part 2, and Policy SUT2 of the Emerging Local Plan.
7.If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the Local Planning Authority) shall be carried out until the developer has submitted a remediation strategy to the Local Planning Authority detailing how this unsuspected contamination shall be dealt with and obtained written approval from the Local Planning Authority. The remediation strategy shall be implemented as approved. The reason for the condition is :- Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, in accordance with Policy E6 of the Local Plan Part 2 and Policies HEC5 and HEC6 of the Emerging Local Plan.
8.The development shall be carried out in strict accordance with the Arboricultural Impact Assessment (AIA), Arboricultural Method Statement (AMS) and Tree Protection Plan (TPP) ref. TPP1 produced by Norfolk Wildlife Services. All specified tree protection measures, particularly those concerning the root protection area of the nearby Italian Alder tree during the installation of the soakaway, must be fully implemented prior to the commencement of works and maintained throughout the construction phase. The reason for the condition is :- Reason: To ensure the safe retention and protection of existing trees of amenity value, in accordance with Policy E4 of the Local Plan Part 2 and Policy NAT10 of the Emerging Local Plan.
9.Biodiversity Net Gain (BNG) Condition/Information The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition "(the biodiversity gain condition") that development may not begin unless: a) A Biodiversity Gain Plan has been submitted to the planning authority, and b) The Local Planning Authority has approved the plan. There are statutory exemptions and transitional arrangements which mean that the biodiversity gain condition does not always apply. Based on the information available, this permission is considered to be one which will require the approval of a biodiversity gain plan by Great Yarmouth Council before development is begun. Irreplaceable habitat If the onsite habitat includes irreplaceable habitat (within the meaning of the Biodiversity Gain Requirements (Irreplaceable Habitat) Regulations 2024) then: The Biodiversity Gain Plan must include, in addition to information about steps taken or to be taken to minimise any adverse effect of the development on the habitat, information on arrangements for compensation for any impact the development has on the biodiversity of the irreplaceable habitat. Great Yarmouth Council can only approve a Biodiversity Gain Plan if satisfied that the adverse effect of the development on the biodiversity of the irreplaceable habitat is minimised and appropriate arrangements have been made for the purpose of compensating for any impact which do not include the use of biodiversity credits. For guidance on the contents of the Biodiversity Gain Plan that must be submitted and agreed by the Council prior to the commencement of the consented development please see the link: https://www.gov.uk/guidance/submitabiodiversitygainplan The page below is the main biodiversity net gain guidance link: https://www.gov.uk/government/collections/biodiversitynetgain
10.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.
11.NOTES - Please read the following notes carefully:- 1. The applicant's attention is drawn to the advice of the Council's Environmental Health Officer regarding the Ground Investigation Report (A F Howland Associates Ltd, 22 June 2026). As low concentrations of PAHs have been recorded within the made ground, it is strongly recommended that buried water supply pipework is laid within a clean surround or within the natural ground. If supply pipes must remain in contact with made ground, they should be upgraded to barrier pipes in agreement with the local water utility provider to prevent the degradation of the water supply. 2. Construction work shall not take place outside the following hours:- 07:30 to 18:30 Mondays 07:30 to 18:30 Tuesdays 07:30 to 18:30 Wednesdays 07:30 to 18:30 Thursdays 07:30 to 18:30 Fridays 08:30 to 13:30 Saturdays and no work shall take place on Sundays or Bank Holidays. (These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property) The reason for the condition is :- In the interests of the residential amenities of the occupiers of nearby dwellings.