| 1. | Condition 3 of pp. 06/24/1000/F requires the submission of a strategic foul water strategy.
The following information was submitted:
- Proposed Drainage Plan General Arrangement (Dwg. No. 251229-SUB-XX-XX-DR-C-02300-XX-, Rev. P02)
- Proposed Drainage Details Sheet 1 of 2 (Dwg. No. 251229-SUB-XX-XX-DR-C-02400-XX-, Rev. P02)
- Proposed Drainage Details Sheet 2 of 2 (Dwg. No. 251229-SUB-XX-XX-DR-C-02401-XX-, Rev. P02)
- Proposed External Works General Arrangement (Dwg. No. 251229-SUB-XX-XX-DR-C-02500-XX-, Rev. P01)
Upon full assessment of the submitted details, and in consultation with Anglian Water, these are considered acceptable and are hereby approved. Prior to occupation, the foul water drainage works must have been carried out in complete accordance with the approved scheme. |