| 1. | Condition 3 of pp. 06/23/0669/F requires the submission of a Construction Management and Traffic Plan including:
·Details of the 'Construction Traffic Access Routes' to be used both within and without the development site;
·Details demonstrating adequate provision for addressing any abnormal wear and tear to the highway, together with wheel cleaning facilities, and proposals to control and manage construction;
·Details of traffic using the 'Construction Traffic Access Route', and details to ensure no other local roads are used by construction traffic;
·Details of car parking for construction workers, which shall be contained within the site wherever possible and practical;
·The plan shall be prepared in accordance with BS42020 and shall detail how the applicant will mitigate all emissions (including dust, noise, vibration, water, light etc) from demolition and construction activities;
·Communication with neighbours before and during works including contact arrangements by which residents can raise any concerns and issues, and proposed mechanisms for investigation and responding to residents' concerns;
·Details of management arrangements to be used to minimise noise and dust (including staff training such as toolbox talks);
·Details of hours of work during which noisy and potentially dusty activities will take place;
·Details of measures to control loud radios on site and measures to be taken to ensure noisy activities take place away from residential premises where possible, such as providing a separate compound for cutting and grinding activities;
·Details of measures to control dust from excavation, wetting of soil, dust netting and loading and transportation of soil, such as minimising drop heights, sheeting of vehicles;
·Details of measures to control dust from soil stockpiles, such as sheeting, making sure that stockpiles exist for the shortest possible time and locating stockpiles away from residential premises;
·Details of measures to control dust from vehicle movements, such as site speed limits, cleaning of site roads and wetting of vehicle routes in dry weather;
·Details of measures to minimise dust generating activities on windy and dry days; and,
·Confirmation that no burning of any materials will occur on site at any time.
The following information was submitted:
- Construction Phase Traffic Management Plan Rev.A. New Development at Kings Drive Bradwell. Received 26.05.2026.
- Construction Phase Plan. Kings Drive Bradwell Site A NR318TF. 20.02.2026. Received 30.03.2026.
- Welfare Layout. Unreferenced. Received 30.03.2026.
Upon full assessment of the submitted details, these are considered acceptable and are hereby approved. For the duration of the construction period all traffic associated with the construction of the development must comply with the approved Construction Management and Traffic Plans and must use only the 'Construction Traffic Access Route' and no other local roads unless otherwise first agreed in writing with the Local Planning Authority. The car parking for construction works must be provided and maintained available for use throughout the duration of the construction period. The development shall be undertaken in strict accordance with the details as approved. |