| No. | Condition Text |
|---|
| 1. | The development shall be carried out in accordance with the following revised plans received by the Local Planning Authority on the 18th March 2026
Location Plan and Block Plan
Proposed Plans and Elevations
The reason for the condition is:-
For the avoidance of doubt of what has been approved and in the interests of proper planning. |
| 2. | By no later than the 15th July 2027 the heather brick slips shall be installed in their entirety on the south, east and west elevations of the bungalow over the existing render in accordance with the approved plan (Proposed Plans and Elevations). Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting the order), the installed brick slips shall be retained in perpetuity for the life time of the development and no changes in external materials shall be permitted.
The reason for the condition is:-
To ensure a satisfactory appearance of the development in the interests of visual amenity and to secure a high quality design, in line with Polices HOU11 and DHE1, Section CI4 of the Design Code and Policy 3 of the Hemsby Neighbourhood Plan. This work needs to be completed within the 9 month time period set out in the condition due to the current harm to the streetscene and conflict with the Neighbourhood Plan. |
| 3. | By no later than the 15th July 2027 the entirety of the existing timber cladding on the south, west and north elevations of the existing porch shall be treated in Osmo Natural Wood Oil Stain Walnut 707. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting the order), the timber cladding shall be regularly maintained with Osmo Natural Wood Oil Stain Walnut 707 for the lifetime of the development and at no time shall be painted or stained any other colour.
The reason for the condition is:-
To ensure a satisfactory appearance of the development in the interests of visual amenity and to secure a high quality design, in line with Polices HOU11 and DHE1, Section CI4 of the Design Code and Policy 3 of the Hemsby Neighbourhood Plan. This work needs to be completed within the 9 month time period set out in the condition due to the current harm to the streetscene and conflict with the Neighbourhood Plan. |
| 4. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner. |