Great Yarmouth Borough Council Portal
No.Condition Text
1.Condition 6 Part (a) requires that a scheme of fire hydrants is submitted to and approved by the Local Planning Authority: This application is supported by the following information: - Essex and Suffolk Water Site plan showing location of fire hydrants; drawing reference: BLUE/319288 - Water Network Plan; drawing reference: WN0015072-6_1of_1_0_appendix The submitted information is considered acceptable and approved and condition 6 Part (a) is hereby discharged in FULL. The applicant is reminded about the need to fully comply with Condition 6 Part (B), which states: "No dwelling shall be occupied until the fire hydrant(s) serving that dwelling or group of dwellings have been fully installed and made operational in accordance with the approved details and to the satisfaction of the Local Planning Authority, in consultation with Norfolk Fire and Rescue Service. The cost of supplying and installing the hydrants shall be met by the developer."