No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the details within the planning application form, and with the following plans received by the Local Planning Authority on the 17th February 2026: - Existing and proposed elevations, block plan and location plan - Dated February 2026. The reason for the condition is:- For the avoidance of doubt of what has been approved and in the interests of proper planning.
3.The extension shall be constructed with finished floor levels matching the existing dwelling. The reason for the condition is :- To ensure the flood risk to people and property is adequately mitigated for, in accordance with the recommendation of the submitted Flood Risk Assessment and policy CS13 of the Core Strategy (2015).
4.No development shall take place other than in strict accordance with the approved Arboricultural Impact Assessment - Reference: OAS 26-103-AR01 -  throughout the course of demolition and construction. For the avoidance of doubt, this shall include installing tree protection fencing and root ground protection to protect T1.  This shall be installed prior to the demolition of the conservatory and thereafter shall be retained and maintained around the T1 tree for the duration of the construction period.  The reason for the condition is:-  To ensure that the trees are not adversely impact during the construction of the approved dwellings; in accordance with Core Strategy (2015) Policy CS11 and Local Plan Part 2 (2021) Policy E4.
5.INFORMATIVE NOTE: Hours of Work: Due to the close proximity of other residential dwellings and/or businesses, the hours of any construction or refurbishment works that are audible outside of the boundary of the site should be restricted to reduce the likelihood of noise disturbance to: 0730 hours to 1830 hours Monday to Friday 0830 hours to 1330 hours Saturdays No work on Sundays or Bank Holidays.
6.INFORMATIVE NOTE: Asbestos: The developer is reminded that prior to any works commencing on site the building is required to be surveyed for the presence of asbestos containing materials in accordance with the Control of Asbestos Regulations 2012. Any asbestos containing materials which are identified shall be managed or removed in accordance with the above regulations and waste regulations. Failure to comply with these regulations could result in prosecution by the relevant authority. For further help and advice in respect of asbestos removal the applicant/agent is advised to contact the Health and Safety Executive (HSE) (www.hse.gov.uk/asbestos)
7.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.