Great Yarmouth Borough Council Portal
No.Condition Text
1.Condition 3 requires that a foul drainage strategy is submitted to and approved in writing by the Local Planning Authority. The application is supported by the following documentation: - Pumping Station Technical Pack; Reference: 317655 St Elizabeth Hospice Foul Water REV A - Flood Risk Assessment, Document Reference: JE/VL/P24-3232/08) dared April 2025 and prepared by Create Consulting Engineers (Create) Limited. The following relevant sections/plans from the Flood Risk Assessment apply: . Section 5.0 details the Foul and Surface Water Drainage And Flood Risk From the Development and Plans - . Drawing Ref: 3232-CCE-XX-XX-DR-D-0002 Rev P03 - Foul and Surface Water Drainage Layout Sheet 1 of 3 . Drawing Ref: 3232-CCE-XX-XX-DR-D-0003 Rev P03 - Foul and Surface Water Drainage Layout Sheet 2 of 3 . Drawing Ref: 3232-CCE-XX-XX-DR-D-0004 Rev P01 - Foul and Surface Water Drainage Layout Sheet 3 of 3 The submitted information is considered acceptable and the condition is hereby discharged in PART. The condition cannot be discharged in full as it requires the foul drainage scheme to be installed in accordance with the approved details prior to first occupation.