| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the following revised plans received by the Local Planning Authority on 11th April 2025
Drawing No. 1933/3, Mixed Plans and Location Plan, Prepared by Andrew Middleton.
The reason for the condition is:-
For the avoidance of doubt of what has been approved and in the interests of proper planning. |
| 3. | Any access gates/bollard/chain/other means of obstruction shall be hung to open inwards, set back, and thereafter retained a minimum distance of 5 metres from the near channel edge of the adjacent carriageway. Any sidewalls/fences/hedges adjacent to the access shall be splayed at an angle of 45 degrees from each of the outside gateposts to the front boundary of the site.
Reason: In the interests of highway safety enabling vehicles to safely draw off the highway before the gates/obstruction is opened. |
| 4. | Prior to the first use of the development hereby permitted 2.4 metre wide parallel visibility splay (as measured back from the near edge of the adjacent highway carriageway) shall be provided across the whole of the site's roadside frontage. The splay shall thereafter be maintained at all times free from any obstruction exceeding 1.0 metres above the level of the adjacent highway carriageway.
Reason: In the interests of highway safety in accordance with the principles of the NPPF |
| 5. | INFORMATIVE:
It is the Applicant's responsibility to clarify the boundary with the public highway. Private structures such as fences, or walls will not be permitted on highway land. The highway boundary may not match the applicant's title plan. For further details please contact the highway research team at highway.boundaries@norfolk.gov.uk |