| 1. | Condition 9 of pp 06/22/1027/F required submission of a preliminary risk assessment identifying all previous uses of land, potential contaminants associated with uses, a conceptual model of the site indicating sources, pathways and receptors, any potentially unacceptable risks arising from contamination at the site;
The following information was submitted:
Site Investigation report - Reference GC24745_SI - Dated December 2021 - prepared by Harrision Geotechnical
DATASHEET: SITE INVESTIGATION METHODS - Preapred by Harrison Geotechnical - Report No. GC24745_SI
Groundsure Insights map - document - dated 13 October 2021 - Reference G S-8259766
Groundsure Location intelligence - dated 13 October 2021 - Reference GC24745_37866-CS
Site Investigation Fieldwork & Lab Data - Dated 01/11/2021-prepared by Harrison Group
Upon full assessment of the submitted material supporting the application, taking into account all material considerations, it is considered the requirements of condition 9 have been met, and the condition can be discharged in FULL. |