| No. | Condition Text |
|---|---|
| 1. | Condition 10 of planning permission 06/20/0156/O requires a Foul Drainage Scheme to be submitted and approved and to be completed and implemented in accordance with the approved details prior to first occupation of the development and to be retained and operated as such thereafter. The following details were submitted: Drainage Layout Sheet 1 Drawing Number 1135-111-001 - Rev A - Prepared by EDJ Engineering Consultancy - Dated April 2024 Drainage Layout Sheet 2 Drawing Number 1035-111-002 - Rev A - Prepared by EDJ Engineering Consultancy - Dated April 2024 Drainage Layout Sheet 3 Drawing Number 1035-111-003 - Rev - - Prepared by EDJ Engineering Consultancy - Dated April 2024 Drainage Layout Sheet 4 Drawing Number 1035-111-004 - Rev - - Prepared by EDJ Engineering Consultancy - Dated April 2024 Section 104 Agreement Layout - Drawing Number 1035-113-001 - Rev B - Prepared by EDJ Engineering Consultancy - Dated April 2024 Manhole Schedules - Drawing Number 1035-116-001 - Rev B - Prepared by EDJ Engineering Consultancy - Dated April 2024 Highway and Drainage Long Sections - Drawing Number - 1035-117-001 - Rev A - Prepared by EDJ Engineering Consultancy - Dated April 2024 These drawings are acceptable and are hereby approved and the condition is discharged in PART. The condition can only be fully discharged upon completion and implementation in accordance with the approved details prior to first occupation of the development. The development is to be retained and operated as approved thereafter. |