| No. | Condition Text |
|---|---|
| 1. | Condition 7 of 06/22/0827/D required details of the provision of Fire Hydrants throughout Phase 6 of Bluebell Meadow. The condition also requires a timescale of installation of fire hydrants in line with proposed occupation of the dwellings. The following information was submitted: Drawing No. BLUE/319288 - Prepared by Essex and Suffolk Living Water - Dated 11th July 2024 Time Scale Plan PDF - Submitted 30th June 2025 The submitted materials details are acceptable and herby approved and condition 7 can be discharged in Part. The condition can only be discharged in part as the development must be built in accordance with the approved plans. |