Great Yarmouth Borough Council Portal
No.Condition Text
1.Condition 37 requires that a surface water drainage scheme is submitted to and approved in writing by the Local Planning Authority and that the approved drainage scheme is implemented. The application is supported by the following documentation: - Ref: EK/SJB/211049.1 Rev 2 - Phase 2 Flood Risk Assessment and Drainage Strategy Addendum, prepared by Rossi Long Consulting; - Ref: EK/SJB/211049.2 Rev 2 - Phase 3 Flood Risk Assessment and Drainage Strategy Addendum, prepared by Rossi Long Consulting. - document-5427144.pdf, Surface Water Highway Drainage Statement for New Development Beacon Park, Site 25, Phase 2 & 3 Gorleston Norfolk, Rossi Long Consulting, 19 November 2024 The submitted information is considered acceptable and the condition is hereby discharged in PART. The condition can only be discharged in part as the surface water drainage scheme must be installed and made available for use prior to first occupation and retained in accordance with the approved details.