Great Yarmouth Borough Council Portal
No.Condition Text
1.Condition 5 requires that details of plant equipment and air source heat pumps are submitted to and approved in writing by the Local Planning Authority and are thereafter installed, used, maintained and retained in full working order thereafter in full accordance with the approved details. The application is supported by the following documentation: - Electrical Engineering Services Photovoltaic Layout Roof Plan; reference: 7358-MCP-V1-0R-DR-E-8000 - Mechanical Engineering Services Roof Level Plant Layout; reference: 7358-MCP-ZZ-RL-DR-M-8002 - Technical Data; reference: E230775-G AHU - AHU Models; reference: 12535-01B-Model - AHU Models; reference: 12535-02B-Model - AHU Models; reference: 12535-03A-Model - Chiller Information; reference: Chiller Schedule - Chiller Information; reference: Drawing - AQUACIAT LD 0600R - ASHP Domestics; ASHP Schedule - Domestic Hot Water - ASHP Domestics; drawing- CALEO -0300 - ASHP Heating - ASHP Schedule - Space Heating (1) - ASHP Heating - drawing- AQUACIAT POWER ILD 0800R - environmental noise assessment; reference: 2695A-R1 - Asset, Maint & Warranty Schedules; reference: JPUH OEH & CDC - Dalair- InstallationandMaintenanceServiceManual' The submitted details are acceptable and are hereby approved and the condition is discharged in PART. The condition can only be discharged in part as the condition requires the equipment is thereafter installed, used, maintained and retained in full working order thereafter in full accordance with the approved details.