2. | The development shall be carried out in accordance with the revised plan received by the Local Planning Authority on 23rd September 2024:
- Site Location Plan, ref. ZST- 0000-01
and the following plan received on the 19th November 2024:
- Site Proposed Elevation, ref. ZST-0000-09 Rev D
- Proposed Layout, ref. ZST-0000-03 Rev D
- Finished Plan, ref. ZST-0000-12 Rev D
- Swept Path Analysis, ref. ZST-0100-02 Rev D
- Ductwork Layout, ref. ZST-0500-03 Rev D
and the following plan received on the 13th January 2025:
- Feeder Pillar Elevations, ref. ZST-0000-06-03 Rev C
The reason for the condition is :- For the avoidance of doubt. |